![Conductix-Wampfler SingleFlexLine Program 0815 Скачать руководство пользователя страница 93](http://html1.mh-extra.com/html/conductix-wampfler/singleflexline-program-0815/singleflexline-program-0815_operating-instructions-manual_2651969093.webp)
Operating Instructions
Single-pole Conductor Rail System
SingleFlexLine Program 0815
BAL0815-0002g-US
www.conductix.us
translated document
page 93 of 128
Fig. 129: Mount the EMS current collector (08150A / B…) onto the towing plate
NOTE!
One screw can be placed on each pole at the EMS current collector!
The screw heads are to be covered by the current collectors!
→
When installing current collectors, ensure that the installation position is correct.
→
For types without an integrated cable guide, take care with the selection of the connecting cable and ensure the connecting
cables are installed without tensile or directional forces:
→
Use only highly flexible Conductix-Wampfler cables! Basically, only use connecting cables with copper conductors.
→
Use a blade receptable with protective cap for the flexible connecting cables.
→
For phases, double insulated connecting cables must be provided for voltages > 48 V.
→
Do not bundle, fix or attach identification signs to the current collector connecting cable!
→
Do not allow foreign objects to protrude into the moving range of the current collector and connecting cables!
→
For systems with curves/bends, ensure that the current collector is installed in the pivot or steering axis — only by doing this can
it be ensured that the correct contact pressure is maintained when passing through (inner/outer) curves.
DANGER!
Danger of electric shock!
Always protect unoccupied sockets on the current collector heads with protective caps!
The open connection must always be protected with a protective cap. This must also be observed when
changing current collector heads (see Fig. 130).
1
3
2
1
3
2
Pos.
Description
1
DIN EN ISO 4017 M5 screws
2
Anti-rotation device
3
Room for screw head underneath cur-
rent collector