![Conductix-Wampfler SingleFlexLine Program 0815 Скачать руководство пользователя страница 43](http://html1.mh-extra.com/html/conductix-wampfler/singleflexline-program-0815/singleflexline-program-0815_operating-instructions-manual_2651969043.webp)
Operating Instructions
Single-pole Conductor Rail System
SingleFlexLine Program 0815
BAL0815-0002g-US
www.conductix.us
translated document
page 43 of 128
To avoid undesired deformations of the conductor rail, the plastic insert supplied must be inserted in the slit in the contact surface
before forming the bend and the removed once the bending process is complete.
Fig. 29: Making a horizontal bend with a plastic insert
NOTE!
Ensure that the insert PE
plus
is installed in the correct position!
→
When bending the PE
plus
rail, ensure that the installation position is correct.
→
If necessary, re-measure (cut surfaces 5.3 mm or see surface A in Fig. 30)
Fig. 30: Insert PE
plus
A
5.3
5
Pos.
Name
1
Upper bending roller
2
Lower bending roller
3
Horizontal bend
4
Plastic insert 4x6 mm (white)
4
Insert PE
plus
for bending device
5.3x5 mm (black)