![Conductix-Wampfler SingleFlexLine Program 0815 Скачать руководство пользователя страница 47](http://html1.mh-extra.com/html/conductix-wampfler/singleflexline-program-0815/singleflexline-program-0815_operating-instructions-manual_2651969047.webp)
Operating Instructions
Single-pole Conductor Rail System
SingleFlexLine Program 0815
BAL0815-0002g-US
www.conductix.us
translated document
page 47 of 128
Fig. 36: Comparison of correctly and incorrectly engaged rail
Fig. 37: Clip the hanger clamp into the conductor rail
Standard hanger clamp for screwing on:
To fasten the standard hanger clamps, drill holes must be drilled in the EMS rail. The drilling jig for support profile height 180 mm
(Order No.: 2: 08-V015-0474-001) and the drilling jig for support profile 240 mm (Order No.: 08-V015-0474-002) are available to set
the drill holes quickly and easily.
The holes for the hanger clamps are placed via the row of the female connectors (1). The row of the female connectors has markings
(2 and 3 see Fig. 39 and Fig. 40) indicating the distance between the drill holes of the hanger clamps (detail C). The drill hole distance
depends on the number of poles. The position of the holes can be adjusted in y-direction via the slotted holes (4).
2
1
2
1
Pos.
Name
1
Guideway rail
2
Hanger clamp