Index
IN-10
Cisco ONS 15454 Procedure Guide, R5.0
December 2004
flow control watermark
foreign node setting
enable or disable using LDCC
enable or disable using SDCC
enable using LDCC
enable using SDCC
frame-ground pin
framing
front door
open
remove
replace
fuse and alarm panel
100 amp
80 amp
measure and cut cables
G
gateway network element
gateway settings
GBICs
install
remove
route fiber
see
GBIC
ground
ground cable
ground strap
G-Series Ethernet cards
compatible GBICs
create an STS circuit
flow control watermarks
install
path trace capability
provision ports
provison ports for transponder mode
refresh PM counts
route fiber
slot compatibility with XC10G cards
slot compatibility with XCVT cards
view history PMs
view maintenance information
view statistics
view utilization parameters
H
half circuits
create a half circuit on a BLSR or 1+1
create a half circuit on a path protection
provision a half circuit on a BLSR or 1+1
provision a half circuit on a path protection
hardware redundancy test
high-density BNC EIA
attach coaxial cable
install
high-density shelf
fuse panel requirement
install an AEP
UBIC-V EIAs
upgrade low-density electrical card protection to
high-density
upgrade low-density electrical cards to high-density
electrical cards
XC10G card requirement
hop
hub-and-spoke
hybrid node icon
I
idle time
IIOP
change listener port
provision listener port on CTC
provision listener port on node
Содержание ONS 15454 Series
Страница 28: ...Tables xxviii Cisco ONS 15454 Procedure Guide R5 0 December 2004 ...
Страница 44: ...Tasks xliv Cisco ONS 15454 Procedure Guide R5 0 December 2004 ...
Страница 53: ...liii Cisco ONS 15454 Procedure Guide R5 0 December 2004 About this Guide Document Conventions ...
Страница 55: ...lv Cisco ONS 15454 Procedure Guide R5 0 December 2004 About this Guide Document Conventions ...
Страница 126: ...4 14 Cisco ONS 15454 Procedure Guide R5 0 December 2004 Chapter 4 Turn Up Node NTP A256 Set Up SNMP ...
Страница 168: ...5 42 Cisco ONS 15454 Procedure Guide R5 0 December 2004 Chapter 5 Turn Up Network NTP A172 Create a Logical Network Map ...
Страница 304: ...10 8 Cisco ONS 15454 Procedure Guide R5 0 December 2004 Chapter 10 Change Node Settings NTP A87 Change SNMP Settings ...
Страница 410: ...16 4 Cisco ONS 15454 Procedure Guide R5 0 December 2004 Chapter 16 Power Down the Node NTP A114 Power Down the Node ...
Страница 510: ...17 100 Cisco ONS 15454 Procedure Guide R5 0 March 2005 Chapter 17 DLPs A1 to A99 DLP A99 Determine Available VLANs ...
Страница 746: ...20 102 Cisco ONS 15454 Procedure Guide R5 0 March 2005 Chapter 20 DLPs A300 to A399 DLP A399 Install a UBIC H EIA ...
Страница 828: ...A 14 Cisco ONS 15454 Procedure Guide R5 0 December 2004 Appendix A CTC Information and Shortcuts Equipment Inventory ...
Страница 850: ...Index IN 22 Cisco ONS 15454 Procedure Guide R5 0 December 2004 description 4 11 remove 18 23 ...