6-20
Cisco ONS 15454 Procedure Guide, R5.0
August 2005
Chapter 6 Create Circuits and VT Tunnels
NTP-A184 Create an Automatically Routed DS-3 Circuit
Figure 6-4
Setting Circuit Attributes for a DS-3 Circuit
Step 8
If the circuit will be routed on a path protection, complete the
“DLP-A218 Provision Path Protection
.
Step 9
Click
Next
.
Step 10
Complete the
“DLP-A510 Provision a DS-3 Circuit Source and Destination” task on page 22-3
Step 11
In the Circuit Routing Preferences area (
Route Automatically
. Three options are
available; choose based on your preferences:
•
Using Required Nodes/Spans—Check this check box to specify nodes and spans to include or
exclude in the CTC-generated circuit route.
Including nodes and spans for a circuit ensures that those nodes and spans are in the working path
of the circuit (but not the protect path). Excluding nodes and spans ensures that the nodes and spans
are not in the working or protect path of the circuit.
•
Review Route Before Creation—Check this check box to review and edit the circuit route before the
circuit is created.
•
VT-DS3 Mapped Conversion—Check this check box to create a circuit using the portless
transmultiplexing interface of the DS3XM-12 card.
Содержание ONS 15454 Series
Страница 28: ...Tables xxviii Cisco ONS 15454 Procedure Guide R5 0 December 2004 ...
Страница 44: ...Tasks xliv Cisco ONS 15454 Procedure Guide R5 0 December 2004 ...
Страница 53: ...liii Cisco ONS 15454 Procedure Guide R5 0 December 2004 About this Guide Document Conventions ...
Страница 55: ...lv Cisco ONS 15454 Procedure Guide R5 0 December 2004 About this Guide Document Conventions ...
Страница 126: ...4 14 Cisco ONS 15454 Procedure Guide R5 0 December 2004 Chapter 4 Turn Up Node NTP A256 Set Up SNMP ...
Страница 168: ...5 42 Cisco ONS 15454 Procedure Guide R5 0 December 2004 Chapter 5 Turn Up Network NTP A172 Create a Logical Network Map ...
Страница 304: ...10 8 Cisco ONS 15454 Procedure Guide R5 0 December 2004 Chapter 10 Change Node Settings NTP A87 Change SNMP Settings ...
Страница 410: ...16 4 Cisco ONS 15454 Procedure Guide R5 0 December 2004 Chapter 16 Power Down the Node NTP A114 Power Down the Node ...
Страница 510: ...17 100 Cisco ONS 15454 Procedure Guide R5 0 March 2005 Chapter 17 DLPs A1 to A99 DLP A99 Determine Available VLANs ...
Страница 746: ...20 102 Cisco ONS 15454 Procedure Guide R5 0 March 2005 Chapter 20 DLPs A300 to A399 DLP A399 Install a UBIC H EIA ...
Страница 828: ...A 14 Cisco ONS 15454 Procedure Guide R5 0 December 2004 Appendix A CTC Information and Shortcuts Equipment Inventory ...
Страница 850: ...Index IN 22 Cisco ONS 15454 Procedure Guide R5 0 December 2004 description 4 11 remove 18 23 ...