20-97
Cisco ONS 15454 Procedure Guide, R5.0
March 2005
Chapter 20 DLPs A300 to A399
DLP-A399 Install a UBIC-H EIA
DLP-A399 Install a UBIC-H EIA
Caution
Always use an ESD wristband when working with a powered ONS 15454. Plug the wristband cable into
the ESD jack located on the lower-right outside edge of the shelf assembly.
Note
UBIC EIAs can only be installed on shelf assembly 15454-SA-HD. 15454-SA-HD shelf assemblies are
differentiated from other shelf assemblies by the blue hexagon symbol, which indicates the available
high-density slots, found under Slots 1 through 3 and 15 through 17.
Note
UBIC-V or UBIC-H EIAs are required when using high-density (48-port DS-3 and 12-port DS3XM)
electrical cards.
Step 1
Locate the correct UBIC-H EIA for the side you want to install and remove the UBIC-H EIA from the
packaging.
Step 2
Verify that none of the pins on the UBIC-H EIA are bent.
Step 3
If present, remove the yellow connector protectors.
Step 4
If screws are present in the alignment standoff holes, use a Phillips screwdriver to remove them.
Step 5
Use a flathead screwdriver or 5/16-inch deep socket wrench to tighten the standoffs at 8 to 10 lbf-in (9.2
to 11.5 kgf-cm).
shows the alignment standoffs installed on the shelf.
Purpose
This task installs a Universal Backplane Interface Connector—Horizontal
(UBIC-H) EIA.
Tools/Equipment
#2 Phillips screwdriver
Small slot-head screwdriver
6 perimeter screws, 6-32 x 0.375-inch Phillips head (P/N 48-0422-01)
UBIC-H, A side (15454-EIA-UBICH-A) EIA panel and/or UBIC-H, B side
(15454-EIA-UBICH-B) EIA panel
Prerequisite Procedures
None
Required/As Needed
As needed
Onsite/Remote
Onsite
Security Level
None
Содержание ONS 15454 Series
Страница 28: ...Tables xxviii Cisco ONS 15454 Procedure Guide R5 0 December 2004 ...
Страница 44: ...Tasks xliv Cisco ONS 15454 Procedure Guide R5 0 December 2004 ...
Страница 53: ...liii Cisco ONS 15454 Procedure Guide R5 0 December 2004 About this Guide Document Conventions ...
Страница 55: ...lv Cisco ONS 15454 Procedure Guide R5 0 December 2004 About this Guide Document Conventions ...
Страница 126: ...4 14 Cisco ONS 15454 Procedure Guide R5 0 December 2004 Chapter 4 Turn Up Node NTP A256 Set Up SNMP ...
Страница 168: ...5 42 Cisco ONS 15454 Procedure Guide R5 0 December 2004 Chapter 5 Turn Up Network NTP A172 Create a Logical Network Map ...
Страница 304: ...10 8 Cisco ONS 15454 Procedure Guide R5 0 December 2004 Chapter 10 Change Node Settings NTP A87 Change SNMP Settings ...
Страница 410: ...16 4 Cisco ONS 15454 Procedure Guide R5 0 December 2004 Chapter 16 Power Down the Node NTP A114 Power Down the Node ...
Страница 510: ...17 100 Cisco ONS 15454 Procedure Guide R5 0 March 2005 Chapter 17 DLPs A1 to A99 DLP A99 Determine Available VLANs ...
Страница 746: ...20 102 Cisco ONS 15454 Procedure Guide R5 0 March 2005 Chapter 20 DLPs A300 to A399 DLP A399 Install a UBIC H EIA ...
Страница 828: ...A 14 Cisco ONS 15454 Procedure Guide R5 0 December 2004 Appendix A CTC Information and Shortcuts Equipment Inventory ...
Страница 850: ...Index IN 22 Cisco ONS 15454 Procedure Guide R5 0 December 2004 description 4 11 remove 18 23 ...