5-7
Cisco ONS 15454 Procedure Guide, R5.0
December 2004
Chapter 5 Turn Up Network
NTP-A38 Provision a Linear ADM Network
shows three ONS 15454s in a linear ADM configuration. In this example, working traffic
flows from Slot 5/Node 1 to Slot 5/Node 2, and from Slot 12/Node 2 to Slot 12/Node 3. Slots 6 and 13
contain the protect OC-N cards. Slots 5 and 6 and Slots 12 and 13 are in 1+1 protection.
Figure 5-1
Linear ADM Configuration
Step 2
Click the
Provisioning > Protection
tabs. Verify that 1+1 protection is created for the OC-N cards at
the node. If the protection group has not been created, complete the
“DLP-A73 Create a 1+1 Protection
Step 3
Repeat Steps
and
for all other nodes that you will include in the linear ADM.
Step 4
Verify that the working and protect cards in the 1+1 protection groups correspond to the physical fiber
connections between the nodes, that is, working cards are fibered to working cards and protect cards are
fibered to protect cards.
Step 5
Complete the
“DLP-A377 Provision Section DCC Terminations” task on page 20-61
for the working
OC-N ports on each linear ADM node. Alternatively, if additional bandwidth is needed for CTC
management, complete the
“DLP-A378 Provision Line DCC Terminations” task on page 20-62
Note
If linear ADM nodes are not connected to a LAN, you will need to create the DCC terminations
using a direct (craft) connection to the node. Remote provisioning is possible only after all nodes
without LAN connections have DCC terminations provisioned to in-service OC-N ports.
Note
Terminating nodes (Nodes 1 and 3 in
) will have one DCC termination, and
intermediate nodes (Node 2 in
) will have two DCC terminations (Slots 5 and 12 in
the example).
Step 6
As needed, complete the
“DLP-A380 Provision a Proxy Tunnel” task on page 20-63
.
Step 7
As needed, complete the
“DLP-A381 Provision a Firewall Tunnel” task on page 20-64
Step 8
As needed, complete the
“DLP-A367 Create a Provisionable Patchcord” task on page 20-51
Step 9
Verify that the timing has been set up at each linear node. If not, complete the
. If a node is using line timing, use its working OC-N card as the timing source.
Step 10
Complete the
“NTP-A174 Linear ADM Network Acceptance Test” procedure on page 5-8
.
Stop. You have completed this procedure.
Node 1
Node 3
Node 2
Slot 5 to Slot 5
Slot 6 to Slot 6
Slot 12 to Slot 12
Slot 13 to Slot 13
Working Path
Protect Path
34284
Содержание ONS 15454 Series
Страница 28: ...Tables xxviii Cisco ONS 15454 Procedure Guide R5 0 December 2004 ...
Страница 44: ...Tasks xliv Cisco ONS 15454 Procedure Guide R5 0 December 2004 ...
Страница 53: ...liii Cisco ONS 15454 Procedure Guide R5 0 December 2004 About this Guide Document Conventions ...
Страница 55: ...lv Cisco ONS 15454 Procedure Guide R5 0 December 2004 About this Guide Document Conventions ...
Страница 126: ...4 14 Cisco ONS 15454 Procedure Guide R5 0 December 2004 Chapter 4 Turn Up Node NTP A256 Set Up SNMP ...
Страница 168: ...5 42 Cisco ONS 15454 Procedure Guide R5 0 December 2004 Chapter 5 Turn Up Network NTP A172 Create a Logical Network Map ...
Страница 304: ...10 8 Cisco ONS 15454 Procedure Guide R5 0 December 2004 Chapter 10 Change Node Settings NTP A87 Change SNMP Settings ...
Страница 410: ...16 4 Cisco ONS 15454 Procedure Guide R5 0 December 2004 Chapter 16 Power Down the Node NTP A114 Power Down the Node ...
Страница 510: ...17 100 Cisco ONS 15454 Procedure Guide R5 0 March 2005 Chapter 17 DLPs A1 to A99 DLP A99 Determine Available VLANs ...
Страница 746: ...20 102 Cisco ONS 15454 Procedure Guide R5 0 March 2005 Chapter 20 DLPs A300 to A399 DLP A399 Install a UBIC H EIA ...
Страница 828: ...A 14 Cisco ONS 15454 Procedure Guide R5 0 December 2004 Appendix A CTC Information and Shortcuts Equipment Inventory ...
Страница 850: ...Index IN 22 Cisco ONS 15454 Procedure Guide R5 0 December 2004 description 4 11 remove 18 23 ...