20-50
Cisco ONS 15454 Procedure Guide, R5.0
March 2005
Chapter 20 DLPs A300 to A399
DLP-A365 Initiate an Optical Protection Switch
Step 4
Click
Yes
when the confirmation dialog box appears.
Step 5
Click
OK
when the “Lost connection to node, changing to Network View” dialog box appears.
Note
For LED behavior during a TCC2/TCC2P reboot, see
Step 6
Confirm that the TCC2/TCC2P card LED is amber (standby).
Step 7
Return to your originating procedure (NTP).
DLP-A365 Initiate an Optical Protection Switch
Step 1
In node view, click the
Maintenance
>
Protection
tabs.
Step 2
In the Protection Groups area, select the protection group you want to switch.
Step 3
In the Selected Group area, select the card and port you want to switch.
Step 4
Click
Manual
or
Force
.
If you choose a Manual switch, the command will switch traffic only if the path has an error rate less
than the signal degrade bit error rate threshold. A Force switch will switch traffic even if the path has
SD or SF conditions; however, a Force switch will not override an SF on a 1+1 protection channel. A
Force switch has a higher priority than a Manual switch.
Step 5
In the confirmation dialog box, click
Yes
.
Step 6
Return to your originating procedure (NTP).
DLP-A366 Initiate an Electrical Protection Switch
Purpose
This procedure explains how to initiate a Manual or Force switch on an
optical port.
Tools/Equipment
None
Prerequisite Procedures
DLP-A60 Log into CTC, page 17-66
Required/As Needed
As needed
Onsite/Remote
Onsite or remote
Security Level
Maintenance or higher
Purpose
This task explains how to initiate a traffic switch on an electrical card.
Tools/Equipment
None
Prerequisite Procedures
DLP-A60 Log into CTC, page 17-66
Required/As Needed
As needed
Onsite/Remote
Onsite or remote
Security Level
Maintenance or higher
Содержание ONS 15454 Series
Страница 28: ...Tables xxviii Cisco ONS 15454 Procedure Guide R5 0 December 2004 ...
Страница 44: ...Tasks xliv Cisco ONS 15454 Procedure Guide R5 0 December 2004 ...
Страница 53: ...liii Cisco ONS 15454 Procedure Guide R5 0 December 2004 About this Guide Document Conventions ...
Страница 55: ...lv Cisco ONS 15454 Procedure Guide R5 0 December 2004 About this Guide Document Conventions ...
Страница 126: ...4 14 Cisco ONS 15454 Procedure Guide R5 0 December 2004 Chapter 4 Turn Up Node NTP A256 Set Up SNMP ...
Страница 168: ...5 42 Cisco ONS 15454 Procedure Guide R5 0 December 2004 Chapter 5 Turn Up Network NTP A172 Create a Logical Network Map ...
Страница 304: ...10 8 Cisco ONS 15454 Procedure Guide R5 0 December 2004 Chapter 10 Change Node Settings NTP A87 Change SNMP Settings ...
Страница 410: ...16 4 Cisco ONS 15454 Procedure Guide R5 0 December 2004 Chapter 16 Power Down the Node NTP A114 Power Down the Node ...
Страница 510: ...17 100 Cisco ONS 15454 Procedure Guide R5 0 March 2005 Chapter 17 DLPs A1 to A99 DLP A99 Determine Available VLANs ...
Страница 746: ...20 102 Cisco ONS 15454 Procedure Guide R5 0 March 2005 Chapter 20 DLPs A300 to A399 DLP A399 Install a UBIC H EIA ...
Страница 828: ...A 14 Cisco ONS 15454 Procedure Guide R5 0 December 2004 Appendix A CTC Information and Shortcuts Equipment Inventory ...
Страница 850: ...Index IN 22 Cisco ONS 15454 Procedure Guide R5 0 December 2004 description 4 11 remove 18 23 ...