xlviii
Cisco ONS 15454 Procedure Guide, R5.0
December 2004
About this Guide
Document Organization
Chapter 8, “Monitor Performance”
Includes procedures to change the performance
monitoring (PM) display, monitor performance,
and manage remote monitoring (RMON)
thresholds.
Includes procedures to view circuits and
cross-connect resource usage, modify and delete
circuits and tunnels, convert and upgrade CTC and
TL1 circuits, monitor circuits, and create a J1 path
trace.
Chapter 11, “Change Card Settings”
Includes procedures to change node management
information, CTC network access and view, and
DWDM node settings; change or delete card
protection settings; delete SONET data
communication channel (DCC), line data
communication channel (LDCC), generic
communication channel (GCC), and DWDM
optical service channel (OSC) terminations; and
change node timing, security, and Simple Network
Management Protocol (SNMP).
Chapter 11, “Change Card Settings”
Includes procedures to modify line settings and
PM parameter thresholds for cards, modify alarm
interface controller settings, and upgrade DS-1 and
DS-3 1:1 protection to 1:N protection.
Chapter 12, “Upgrade Cards and Spans”
Includes procedures to prevent an OC-N protection
switch during cross-connect upgrades, upgrade or
downgrade cards, and upgrade spans automatically
or manually.
Chapter 13, “Convert Network Configurations”
Includes procedures to convert network
configurations, modify a BLSR, and manage
BLSR switches.
Chapter 14, “Add and Remove Nodes”
Includes procedures to add or remove BLSR, path
protection, or linear nodes from a network
configuration.
Chapter 15, “Maintain the Node”
Includes procedures to inspect and manage the air
filter, backup and restore the database, restore the
node to factory configuration, off load the security
audit trail log, inhibit card protection switching,
revert software, clean fiber connectors, reset the
TCC2 card using CTC, view Ethernet card
maintenance information, change the node timing
reference, and view the timing report.
Chapter 16, “Power Down the Node”
Includes the procedure to power down the node.
Includes all current tasks (DLPs) from A1 to A99.
Chapter 18, “DLPs A100 to A199”
Includes all current tasks from A100 to A199.
Chapter 19, “DLPs A200 to A299”
Includes all current tasks from A200 to A299.
Table 1
Cisco ONS 15454 Procedure Guide Chapters (continued)
Title
Summary
Содержание ONS 15454 Series
Страница 28: ...Tables xxviii Cisco ONS 15454 Procedure Guide R5 0 December 2004 ...
Страница 44: ...Tasks xliv Cisco ONS 15454 Procedure Guide R5 0 December 2004 ...
Страница 53: ...liii Cisco ONS 15454 Procedure Guide R5 0 December 2004 About this Guide Document Conventions ...
Страница 55: ...lv Cisco ONS 15454 Procedure Guide R5 0 December 2004 About this Guide Document Conventions ...
Страница 126: ...4 14 Cisco ONS 15454 Procedure Guide R5 0 December 2004 Chapter 4 Turn Up Node NTP A256 Set Up SNMP ...
Страница 168: ...5 42 Cisco ONS 15454 Procedure Guide R5 0 December 2004 Chapter 5 Turn Up Network NTP A172 Create a Logical Network Map ...
Страница 304: ...10 8 Cisco ONS 15454 Procedure Guide R5 0 December 2004 Chapter 10 Change Node Settings NTP A87 Change SNMP Settings ...
Страница 410: ...16 4 Cisco ONS 15454 Procedure Guide R5 0 December 2004 Chapter 16 Power Down the Node NTP A114 Power Down the Node ...
Страница 510: ...17 100 Cisco ONS 15454 Procedure Guide R5 0 March 2005 Chapter 17 DLPs A1 to A99 DLP A99 Determine Available VLANs ...
Страница 746: ...20 102 Cisco ONS 15454 Procedure Guide R5 0 March 2005 Chapter 20 DLPs A300 to A399 DLP A399 Install a UBIC H EIA ...
Страница 828: ...A 14 Cisco ONS 15454 Procedure Guide R5 0 December 2004 Appendix A CTC Information and Shortcuts Equipment Inventory ...
Страница 850: ...Index IN 22 Cisco ONS 15454 Procedure Guide R5 0 December 2004 description 4 11 remove 18 23 ...