15-26
Cisco ONS 15454 Procedure Guide, R5.0
December 2004
Chapter 15 Maintain the Node
NTP-A290 Replace the Alarm Interface Panel
NTP-A290 Replace the Alarm Interface Panel
Warning
The covers are an integral part of the safety design of the product. Do not operate the unit without the
covers installed.
Caution
Do not use a 2A AIP with a 5A fan-tray assembly; doing so will cause a blown fuse on the AIP.
Caution
If any nodes in an Ethernet circuit are not using Software R4.0 or later, there is a risk of Ethernet traffic
disruptions. Contact the Cisco Technical Support at 1 800 553-2447 when prompted to do so in the
procedure.
Caution
Always use the supplied ESD wristband when working with a powered ONS 15454. Plug the wristband
cable into the ESD jack located on the lower-right outside edge of the shelf assembly.
Caution
Do not perform this procedure on a node with live traffic. Hot-swapping the AIP can affect traffic and
result in a loss of data. For assistance with AIP replacement contact Cisco Technical Support. See the
“Obtaining Documentation, Obtaining Support, and Security Guidelines” section on page lvi
.
Note
Perform this procedure during a maintenance window. Resetting the active TCC2/TCC2P card can cause
a service disruption of less then 50 ms to OC-N or DS-N traffic. Resetting the active TCC2/TCC2P card
can cause a service disruption of 3 to 5 minutes on all Ethernet traffic due to spanning tree reconvergence
if any nodes in the Ethernet circuit are not using Software R4.0 or later.
Step 1
Review
to ensure that you have compatible components when replacing the
fan-tray assembly and note the alarms that will occur when an incompatibility occurs.
Step 2
Ensure that all nodes in the affected network are running the same software version by completing the
following substeps before replacing the AIP and repairing circuits:
a.
Log into the node if you have not done so already by completing the
ONS 15454 GUI” procedure on page 3-6
Purpose
This procedure replaces the alarm interface panel (AIP) with a new AIP
on an in-service node without affecting traffic; however, shared packet
rings might need to be deleted and rebuilt after the repair procedure.
Ethernet circuits that traverse nodes with a software release prior to R4.0
will be affected.
Tools/Equipment
#2 Phillips screwdriver
Prerequisite Procedures
None
Required/As Needed
As needed
Onsite/Remote
Onsite or remote
Security Level
Provisioning or higher
Содержание ONS 15454 Series
Страница 28: ...Tables xxviii Cisco ONS 15454 Procedure Guide R5 0 December 2004 ...
Страница 44: ...Tasks xliv Cisco ONS 15454 Procedure Guide R5 0 December 2004 ...
Страница 53: ...liii Cisco ONS 15454 Procedure Guide R5 0 December 2004 About this Guide Document Conventions ...
Страница 55: ...lv Cisco ONS 15454 Procedure Guide R5 0 December 2004 About this Guide Document Conventions ...
Страница 126: ...4 14 Cisco ONS 15454 Procedure Guide R5 0 December 2004 Chapter 4 Turn Up Node NTP A256 Set Up SNMP ...
Страница 168: ...5 42 Cisco ONS 15454 Procedure Guide R5 0 December 2004 Chapter 5 Turn Up Network NTP A172 Create a Logical Network Map ...
Страница 304: ...10 8 Cisco ONS 15454 Procedure Guide R5 0 December 2004 Chapter 10 Change Node Settings NTP A87 Change SNMP Settings ...
Страница 410: ...16 4 Cisco ONS 15454 Procedure Guide R5 0 December 2004 Chapter 16 Power Down the Node NTP A114 Power Down the Node ...
Страница 510: ...17 100 Cisco ONS 15454 Procedure Guide R5 0 March 2005 Chapter 17 DLPs A1 to A99 DLP A99 Determine Available VLANs ...
Страница 746: ...20 102 Cisco ONS 15454 Procedure Guide R5 0 March 2005 Chapter 20 DLPs A300 to A399 DLP A399 Install a UBIC H EIA ...
Страница 828: ...A 14 Cisco ONS 15454 Procedure Guide R5 0 December 2004 Appendix A CTC Information and Shortcuts Equipment Inventory ...
Страница 850: ...Index IN 22 Cisco ONS 15454 Procedure Guide R5 0 December 2004 description 4 11 remove 18 23 ...