6-85
Cisco ONS 15454 Procedure Guide, R5.0
August 2005
Chapter 6 Create Circuits and VT Tunnels
NTP-A194 Create Overhead Circuits
Note
An Encapsulation Mismatch Path alarm appears when a point-to-point circuit is created between
two Ethernet card ports with incompatible Encapsulation payload types.
Step 5
Click
Apply
.
Step 6
Refresh the POS statistics:
a.
Click the
Performance > POS Ports > Statistics
tabs.
b.
Click
Refresh
.
Stop. You have completed this procedure.
NTP-A194 Create Overhead Circuits
Step 1
Complete the
“DLP-A60 Log into CTC” task on page 17-66
at the node where you will create the
overhead circuit. If you are already logged in, continue with Step 2.
Step 2
From the View menu, choose
Go to Network View
.
Step 3
As needed, complete the
“DLP-A313 Create a DCC Tunnel” task on page 20-7
Step 4
As needed, complete the
“DLP-A341 Create an IP-Encapsulated Tunnel” task on page 20-32
Step 5
As needed, complete the
“DLP-A83 Provision Orderwire” task on page 17-84
Step 6
As needed, complete the
“DLP-A212 Create a User Data Channel Circuit” task on page 19-8
Stop. You have completed this procedure.
Purpose
This procedure creates overhead circuits on an ONS 15454 network.
Overhead circuits include DCC tunnels, IP-encapsulated tunnels, the
Alarm Interface Controller (AIC) and Alarm Interface
Controller-International (AIC-I) card orderwire, and the AIC-I card user
data channel (UDC).
Tools/Equipment
None
Prerequisite Procedures
NTP-A127 Verify Network Turn Up, page 6-4
Required/As Needed
As needed
Onsite/Remote
Onsite or remote
Security Level
Provisioning or higher
Содержание ONS 15454 Series
Страница 28: ...Tables xxviii Cisco ONS 15454 Procedure Guide R5 0 December 2004 ...
Страница 44: ...Tasks xliv Cisco ONS 15454 Procedure Guide R5 0 December 2004 ...
Страница 53: ...liii Cisco ONS 15454 Procedure Guide R5 0 December 2004 About this Guide Document Conventions ...
Страница 55: ...lv Cisco ONS 15454 Procedure Guide R5 0 December 2004 About this Guide Document Conventions ...
Страница 126: ...4 14 Cisco ONS 15454 Procedure Guide R5 0 December 2004 Chapter 4 Turn Up Node NTP A256 Set Up SNMP ...
Страница 168: ...5 42 Cisco ONS 15454 Procedure Guide R5 0 December 2004 Chapter 5 Turn Up Network NTP A172 Create a Logical Network Map ...
Страница 304: ...10 8 Cisco ONS 15454 Procedure Guide R5 0 December 2004 Chapter 10 Change Node Settings NTP A87 Change SNMP Settings ...
Страница 410: ...16 4 Cisco ONS 15454 Procedure Guide R5 0 December 2004 Chapter 16 Power Down the Node NTP A114 Power Down the Node ...
Страница 510: ...17 100 Cisco ONS 15454 Procedure Guide R5 0 March 2005 Chapter 17 DLPs A1 to A99 DLP A99 Determine Available VLANs ...
Страница 746: ...20 102 Cisco ONS 15454 Procedure Guide R5 0 March 2005 Chapter 20 DLPs A300 to A399 DLP A399 Install a UBIC H EIA ...
Страница 828: ...A 14 Cisco ONS 15454 Procedure Guide R5 0 December 2004 Appendix A CTC Information and Shortcuts Equipment Inventory ...
Страница 850: ...Index IN 22 Cisco ONS 15454 Procedure Guide R5 0 December 2004 description 4 11 remove 18 23 ...