6-22
Cisco ONS 15454 Procedure Guide, R5.0
August 2005
Chapter 6 Create Circuits and VT Tunnels
NTP-A184 Create an Automatically Routed DS-3 Circuit
•
Slot—Choose the slot where a DS3XM-12 card is installed.
•
DS3 Mapped STS—If applicable, choose
Circuit Dest
to indicate that the STS is the circuit
destination, or
Circuit Source
to indicate that the STS is the circuit source.
Step 16
If you selected Using Required Nodes/Spans in
, complete the following substeps; otherwise,
continue with
a.
Click
Next
.
b.
In the Circuit Route Constraints area, click a node or span on the circuit map.
c.
Click
Include
to include the node or span in the circuit. Click
Exclude
to exclude the node or span
from the circuit. The order in which you choose included nodes and spans determines the circuit
sequence. Click spans twice to change the circuit direction.
d.
Repeat Steps b and c for each node or span you wish to include or exclude.
e.
Review the circuit route. To change the circuit routing order, choose a node from the Required
Nodes/Lines or Excluded Nodes Links lists, then click the
Up
or
Down
buttons to change the circuit
routing order. Click
Remove
to remove a node or span.
Note
If a node or span stays gray, that node or span is required.
Step 17
If you selected Review Route Before Creation in
, complete the following substeps; otherwise,
continue with
a.
Click
Next
.
b.
Review the circuit route. To add or delete a circuit span, choose a node on the circuit route. Blue
arrows show the circuit route. Green arrows indicate spans that you can add. Click a span arrowhead,
then click
Include
to include the span or
Remove
to remove the span.
c.
If the provisioned circuit does not reflect the routing and configuration you want, click
Back
to
verify and change circuit information. If the circuit needs to be routed to a different path, see the
“NTP-A185 Create a Manually Routed DS-3 Circuit” procedure on page 6-23
Step 18
Click
Finish
. One of the following actions occurs based on the circuit properties you selected:
•
If you entered more than 1 in the Number of Circuits field and selected Auto-ranged, CTC
automatically creates the number of circuits entered in the Number of Circuits field. If auto-ranging
cannot complete all the circuits, for example, because sequential ports are unavailable at the source
or destination, a dialog box appears. Set the new source or destination for the remaining circuits,
then click
Finish
to continue auto-ranging. After completing the circuits, the Circuits window
appears.
•
If you entered more than 1 in the Number of Circuits field and did not choose Auto-ranged, the
Circuit Creation dialog box appears so you can create the remaining circuits. Repeat Steps
through
for each additional circuit. After completing the circuits, the Circuits window appears.
Step 19
In the Circuits window, verify that the circuits you just created appear in the circuits list.
Step 20
Complete the
“NTP-A135 Test Electrical Circuits” procedure on page 6-36
. Skip this step if you built a
test circuit.
Stop. You have completed this procedure.
Содержание ONS 15454 Series
Страница 28: ...Tables xxviii Cisco ONS 15454 Procedure Guide R5 0 December 2004 ...
Страница 44: ...Tasks xliv Cisco ONS 15454 Procedure Guide R5 0 December 2004 ...
Страница 53: ...liii Cisco ONS 15454 Procedure Guide R5 0 December 2004 About this Guide Document Conventions ...
Страница 55: ...lv Cisco ONS 15454 Procedure Guide R5 0 December 2004 About this Guide Document Conventions ...
Страница 126: ...4 14 Cisco ONS 15454 Procedure Guide R5 0 December 2004 Chapter 4 Turn Up Node NTP A256 Set Up SNMP ...
Страница 168: ...5 42 Cisco ONS 15454 Procedure Guide R5 0 December 2004 Chapter 5 Turn Up Network NTP A172 Create a Logical Network Map ...
Страница 304: ...10 8 Cisco ONS 15454 Procedure Guide R5 0 December 2004 Chapter 10 Change Node Settings NTP A87 Change SNMP Settings ...
Страница 410: ...16 4 Cisco ONS 15454 Procedure Guide R5 0 December 2004 Chapter 16 Power Down the Node NTP A114 Power Down the Node ...
Страница 510: ...17 100 Cisco ONS 15454 Procedure Guide R5 0 March 2005 Chapter 17 DLPs A1 to A99 DLP A99 Determine Available VLANs ...
Страница 746: ...20 102 Cisco ONS 15454 Procedure Guide R5 0 March 2005 Chapter 20 DLPs A300 to A399 DLP A399 Install a UBIC H EIA ...
Страница 828: ...A 14 Cisco ONS 15454 Procedure Guide R5 0 December 2004 Appendix A CTC Information and Shortcuts Equipment Inventory ...
Страница 850: ...Index IN 22 Cisco ONS 15454 Procedure Guide R5 0 December 2004 description 4 11 remove 18 23 ...