6-72
Cisco ONS 15454 Procedure Guide, R5.0
August 2005
Chapter 6 Create Circuits and VT Tunnels
NTP-A146 Test E-Series Circuits
NTP-A146 Test E-Series Circuits
Step 1
Complete the
“DLP-A60 Log into CTC” task on page 17-66
at the ONS 15454 source Ethernet node.
Step 2
On the shelf graphic, double-click the circuit source card.
Step 3
Click the
Provisioning > Ether Port
tabs.
Step 4
Verify the following settings:
•
Mode—Auto, 10 Half, 10 Full, 100 Half, or 100 Full.
•
Enabled—Checked.
•
Priority—Set to the priority level indicated by the circuit or site plan. Priority does not apply to
E-Series cards in port-mapped mode.
•
Stp State—Checked if Spanning Tree Protocol is enabled for the circuit. Stp does not apply to
E-Series cards in port-mapped mode.
Step 5
Click the
Ether VLAN
tab. If the E-Series cards is not in port-mapped mode, verify that the source port
is on the same VLAN as the destination port.
Step 6
Repeat Steps
through
for the destination node.
Step 7
At the destination node, connect the Ethernet test set to the destination port and configure the test set to
send and receive the appropriate Ethernet traffic.
Note
At this point, you are not able to send and receive Ethernet traffic.
Purpose
This procedure tests circuits created on E-Series Ethernet cards
provisioned for multicard EtherSwitch, single-card EtherSwitch, or
port-mapped mode.
Tools/Equipment
Ethernet test set and appropriate fibers
Prerequisite Procedures
This procedure assumes you completed facility loopback tests to test the
fibers and cables from the source and destination ONS 15454s to the fiber
distribution panel or the DSX, and one of the following procedures:
NTP-A191 Create an E-Series EtherSwitch Circuit (Multicard or
Single-Card Mode), page 6-56
NTP-A192 Create a Circuit for an E-Series Card in Port-Mapped Mode,
page 6-59
NTP-A142 Create an E-Series Shared Packet Ring Ethernet Circuit, page
6-61
NTP-A143 Create an E-Series Hub-and-Spoke Ethernet Configuration,
page 6-64
NTP-A145 Create an E-Series Multicard EtherSwitch Manual
Cross-Connect, page 6-69
Required/As Needed
As needed
Onsite/Remote
Onsite
Security
Provisioning or higher
Содержание ONS 15454 Series
Страница 28: ...Tables xxviii Cisco ONS 15454 Procedure Guide R5 0 December 2004 ...
Страница 44: ...Tasks xliv Cisco ONS 15454 Procedure Guide R5 0 December 2004 ...
Страница 53: ...liii Cisco ONS 15454 Procedure Guide R5 0 December 2004 About this Guide Document Conventions ...
Страница 55: ...lv Cisco ONS 15454 Procedure Guide R5 0 December 2004 About this Guide Document Conventions ...
Страница 126: ...4 14 Cisco ONS 15454 Procedure Guide R5 0 December 2004 Chapter 4 Turn Up Node NTP A256 Set Up SNMP ...
Страница 168: ...5 42 Cisco ONS 15454 Procedure Guide R5 0 December 2004 Chapter 5 Turn Up Network NTP A172 Create a Logical Network Map ...
Страница 304: ...10 8 Cisco ONS 15454 Procedure Guide R5 0 December 2004 Chapter 10 Change Node Settings NTP A87 Change SNMP Settings ...
Страница 410: ...16 4 Cisco ONS 15454 Procedure Guide R5 0 December 2004 Chapter 16 Power Down the Node NTP A114 Power Down the Node ...
Страница 510: ...17 100 Cisco ONS 15454 Procedure Guide R5 0 March 2005 Chapter 17 DLPs A1 to A99 DLP A99 Determine Available VLANs ...
Страница 746: ...20 102 Cisco ONS 15454 Procedure Guide R5 0 March 2005 Chapter 20 DLPs A300 to A399 DLP A399 Install a UBIC H EIA ...
Страница 828: ...A 14 Cisco ONS 15454 Procedure Guide R5 0 December 2004 Appendix A CTC Information and Shortcuts Equipment Inventory ...
Страница 850: ...Index IN 22 Cisco ONS 15454 Procedure Guide R5 0 December 2004 description 4 11 remove 18 23 ...