1-6
Cisco ONS 15454 Procedure Guide, R5.0
March 2005
Chapter 1 Install the Shelf and Backplane Cable
NTP-A3 Open and Remove the Front Door
Step 1
Complete the
“DLP-A3 Reverse the Mounting Bracket to Fit a 19-inch (482.6 mm) Rack” task on
if you need to convert from a 23-inch (584.2 mm) to a 19-inch (482.6 mm) rack.
Step 2
To install the air filter on the bottom of the shelf rather than below the fan-tray assembly, complete the
“DLP-A4 Install the External Brackets and Air Filter” task on page 17-4
Step 3
Complete the necessary rack mount task:
•
DLP-A5 Mount the Shelf Assembly in a Rack (One Person), page 17-5
•
DLP-A6 Mount the Shelf Assembly in a Rack (Two People), page 17-6
•
DLP-A7 Mount Multiple Shelf Assemblies in a Rack, page 17-7
Step 4
Continue with the
“NTP-A3 Open and Remove the Front Door” procedure on page 1-6
.
Stop. You have completed this procedure.
NTP-A3 Open and Remove the Front Door
Step 1
Complete the
“DLP-A8 Open the Front Door” task on page 17-8
.
Step 2
As needed, complete the
“DLP-A9 Remove the Front Door” task on page 17-9
.
Step 3
Continue with the
“NTP-A4 Remove the Backplane Covers” procedure on page 1-7
Stop. You have completed this procedure.
Purpose
This procedure opens and removes the front door to access the equipment.
Tools/Equipment
Open-end wrench
Pinned hex key
Prerequisite Procedures
NTP-A2 Install the Shelf Assembly, page 1-5
Required/As Needed
Required
Onsite/Remote
Onsite
Security Level
None
Содержание ONS 15454 Series
Страница 28: ...Tables xxviii Cisco ONS 15454 Procedure Guide R5 0 December 2004 ...
Страница 44: ...Tasks xliv Cisco ONS 15454 Procedure Guide R5 0 December 2004 ...
Страница 53: ...liii Cisco ONS 15454 Procedure Guide R5 0 December 2004 About this Guide Document Conventions ...
Страница 55: ...lv Cisco ONS 15454 Procedure Guide R5 0 December 2004 About this Guide Document Conventions ...
Страница 126: ...4 14 Cisco ONS 15454 Procedure Guide R5 0 December 2004 Chapter 4 Turn Up Node NTP A256 Set Up SNMP ...
Страница 168: ...5 42 Cisco ONS 15454 Procedure Guide R5 0 December 2004 Chapter 5 Turn Up Network NTP A172 Create a Logical Network Map ...
Страница 304: ...10 8 Cisco ONS 15454 Procedure Guide R5 0 December 2004 Chapter 10 Change Node Settings NTP A87 Change SNMP Settings ...
Страница 410: ...16 4 Cisco ONS 15454 Procedure Guide R5 0 December 2004 Chapter 16 Power Down the Node NTP A114 Power Down the Node ...
Страница 510: ...17 100 Cisco ONS 15454 Procedure Guide R5 0 March 2005 Chapter 17 DLPs A1 to A99 DLP A99 Determine Available VLANs ...
Страница 746: ...20 102 Cisco ONS 15454 Procedure Guide R5 0 March 2005 Chapter 20 DLPs A300 to A399 DLP A399 Install a UBIC H EIA ...
Страница 828: ...A 14 Cisco ONS 15454 Procedure Guide R5 0 December 2004 Appendix A CTC Information and Shortcuts Equipment Inventory ...
Страница 850: ...Index IN 22 Cisco ONS 15454 Procedure Guide R5 0 December 2004 description 4 11 remove 18 23 ...