5-21
Cisco ONS 15454 Procedure Guide, R5.0
December 2004
Chapter 5 Turn Up Network
NTP-A44 Provision Path Protection Nodes
Step 1
Verify that the fiber is correctly connected to the path protection trunk (span) OC-N cards similar to
“DLP-A43 Install Fiber-Optic Cables for Path Protection Configurations” task on
.
Figure 5-6
Path Protection Fiber Connection Example
Step 2
Log into an ONS 15454 in the path protection you are turning up. See the
. If you are already logged in, continue with Step
.
Step 3
Complete the
“DLP-A377 Provision Section DCC Terminations” task on page 20-61
cards/ports that will serve as the path protection ports on the node, for example, Slot 5 (OC-48)/Node 1
and Slot 12 (OC-48)/Node 1. (Alternatively, if additional bandwidth is needed for CTC management,
complete the
“DLP-A378 Provision Line DCC Terminations” task on page 20-62
Note
If an ONS 15454 is not connected to a corporate LAN, DCC or LDCC provisioning must be
performed through a direct (craft) connection. Remote provisioning is possible only after all
nodes in the network have DCC or LDCC terminations provisioned to in-service OC-N ports.
Step 4
Repeat Steps
and
for each node in the path protection.
Step 5
As needed, complete the
“DLP-A380 Provision a Proxy Tunnel” task on page 20-63
.
Step 6
As needed, complete the
“DLP-A381 Provision a Firewall Tunnel” task on page 20-64
Step 7
As needed, complete the
“DLP-A367 Create a Provisionable Patchcord” task on page 20-51
Step 8
Complete the
“NTP-A177 Path Protection Acceptance Test” procedure on page 5-22
Stop. You have completed this procedure.
68120
Node 1
Slot 5
Tx
Rx
Slot 12
Tx
Rx
Node 4
Slot 5
Tx
Rx
Slot 12
Tx
Rx
Node 2
Slot 5
Tx
Rx
Slot 12
Tx
Rx
Node 3
Slot 5
Tx
Rx
Slot 12
Tx
Rx
Содержание ONS 15454 Series
Страница 28: ...Tables xxviii Cisco ONS 15454 Procedure Guide R5 0 December 2004 ...
Страница 44: ...Tasks xliv Cisco ONS 15454 Procedure Guide R5 0 December 2004 ...
Страница 53: ...liii Cisco ONS 15454 Procedure Guide R5 0 December 2004 About this Guide Document Conventions ...
Страница 55: ...lv Cisco ONS 15454 Procedure Guide R5 0 December 2004 About this Guide Document Conventions ...
Страница 126: ...4 14 Cisco ONS 15454 Procedure Guide R5 0 December 2004 Chapter 4 Turn Up Node NTP A256 Set Up SNMP ...
Страница 168: ...5 42 Cisco ONS 15454 Procedure Guide R5 0 December 2004 Chapter 5 Turn Up Network NTP A172 Create a Logical Network Map ...
Страница 304: ...10 8 Cisco ONS 15454 Procedure Guide R5 0 December 2004 Chapter 10 Change Node Settings NTP A87 Change SNMP Settings ...
Страница 410: ...16 4 Cisco ONS 15454 Procedure Guide R5 0 December 2004 Chapter 16 Power Down the Node NTP A114 Power Down the Node ...
Страница 510: ...17 100 Cisco ONS 15454 Procedure Guide R5 0 March 2005 Chapter 17 DLPs A1 to A99 DLP A99 Determine Available VLANs ...
Страница 746: ...20 102 Cisco ONS 15454 Procedure Guide R5 0 March 2005 Chapter 20 DLPs A300 to A399 DLP A399 Install a UBIC H EIA ...
Страница 828: ...A 14 Cisco ONS 15454 Procedure Guide R5 0 December 2004 Appendix A CTC Information and Shortcuts Equipment Inventory ...
Страница 850: ...Index IN 22 Cisco ONS 15454 Procedure Guide R5 0 December 2004 description 4 11 remove 18 23 ...