18-22
Cisco ONS 15454 Procedure Guide, R5.0
March 2007
Chapter 18 DLPs A100 to A199
DLP-A154 Modify a 1+1 Protection Group
Step 5
Click
Apply
. The changes are applied. Confirm that the changes appear; if not repeat the task.
Note
To convert electrical protection groups, see the
“NTP-A91 Upgrade DS-1 and DS-3 Protect
Cards from 1:1 Protection to 1:N Protection” procedure on page 11-4
.
Step 6
Return to your originating procedure (NTP).
DLP-A154 Modify a 1+1 Protection Group
Step 1
In node view, click the
Provisioning
>
Protection
tabs.
Step 2
In the Protection Groups area, click the 1+1 protection group you want to modify.
Step 3
In the Selected Group area, you can modify the following, as needed:
•
Name—Type the changes to the protection group name. The name can have up to 32 alphanumeric
characters.
•
Bidirectional switching—Check or uncheck.
•
Revertive—Check this box if you want traffic to revert to the working card after failure conditions
stay corrected for the amount of time chosen from the Reversion Time drop-down list. Uncheck if
you do not want traffic to revert.
•
Reversion time—If the Revertive check box is selected, choose the reversion time from the
Reversion time drop-down list. The range is 0.5 to 12.0 minutes. The default is 5.0 minutes. This is
the amount of time that will elapse before the traffic reverts to the working card. Traffic can revert
when conditions causing the switch are cleared.
See the
“DLP-A73 Create a 1+1 Protection Group” task on page 17-81
for field descriptions.
Step 4
Click
Apply
. Confirm that the changes appear; if not repeat the task.
Step 5
Return to your originating procedure (NTP).
Purpose
This task modifies a 1+1 protection group for any optical port (OC-3,
OC-12, OC-12 IR, OC-48, OC-48 AS, and OC-192).
Tools/Equipment
None
Prerequisite Procedures
DLP-A73 Create a 1+1 Protection Group, page 17-81
DLP-A60 Log into CTC, page 17-66
Required/As Needed
As needed
Onsite/Remote
Onsite or remote
Security Level
Provisioning or higher
Содержание ONS 15454 Series
Страница 28: ...Tables xxviii Cisco ONS 15454 Procedure Guide R5 0 December 2004 ...
Страница 44: ...Tasks xliv Cisco ONS 15454 Procedure Guide R5 0 December 2004 ...
Страница 53: ...liii Cisco ONS 15454 Procedure Guide R5 0 December 2004 About this Guide Document Conventions ...
Страница 55: ...lv Cisco ONS 15454 Procedure Guide R5 0 December 2004 About this Guide Document Conventions ...
Страница 126: ...4 14 Cisco ONS 15454 Procedure Guide R5 0 December 2004 Chapter 4 Turn Up Node NTP A256 Set Up SNMP ...
Страница 168: ...5 42 Cisco ONS 15454 Procedure Guide R5 0 December 2004 Chapter 5 Turn Up Network NTP A172 Create a Logical Network Map ...
Страница 304: ...10 8 Cisco ONS 15454 Procedure Guide R5 0 December 2004 Chapter 10 Change Node Settings NTP A87 Change SNMP Settings ...
Страница 410: ...16 4 Cisco ONS 15454 Procedure Guide R5 0 December 2004 Chapter 16 Power Down the Node NTP A114 Power Down the Node ...
Страница 510: ...17 100 Cisco ONS 15454 Procedure Guide R5 0 March 2005 Chapter 17 DLPs A1 to A99 DLP A99 Determine Available VLANs ...
Страница 746: ...20 102 Cisco ONS 15454 Procedure Guide R5 0 March 2005 Chapter 20 DLPs A300 to A399 DLP A399 Install a UBIC H EIA ...
Страница 828: ...A 14 Cisco ONS 15454 Procedure Guide R5 0 December 2004 Appendix A CTC Information and Shortcuts Equipment Inventory ...
Страница 850: ...Index IN 22 Cisco ONS 15454 Procedure Guide R5 0 December 2004 description 4 11 remove 18 23 ...