5-33
Cisco ONS 15454 Procedure Guide, R5.0
December 2004
Chapter 5 Turn Up Network
NTP-A225 Open-Ended Path Protection Acceptance Test
.) Do not create DCC or LDCC terminations for the card/port that connects to the third-party
equipment. For example in
, DCC terminations are created at the following
cards/ports:
•
Nodes 1 and 6: Slot 5 and Slot 12
•
Node 2 and 5: Slot 12
•
Node 3 and 4: Slot 5
Note
If an ONS 15454 is not connected to a corporate LAN, DCC or LDCC provisioning must be
performed through a direct (craft) connection. Remote provisioning is possible only after all
nodes in the network have DCC or LDCC terminations provisioned to in-service OC-N ports.
Step 5
Repeat Steps
and
for each node in the path protection.
Step 6
As needed, complete the
“DLP-A380 Provision a Proxy Tunnel” task on page 20-63
.
Step 7
As needed, complete the
“DLP-A381 Provision a Firewall Tunnel” task on page 20-64
Step 8
Following the documentation provided by the third-party vendor, provision the optical loop leading from
the ONS 15454 connection at one end to the ONS 15454 connection at the other end. In other words,
you will create an open-ended path protection using procedures for the third-party equipment.
Step 9
Complete the
“NTP-A225 Open-Ended Path Protection Acceptance Test” procedure on page 5-33
Stop. You have completed this procedure.
NTP-A225 Open-Ended Path Protection Acceptance Test
Caution
This procedure might be service affecting if performed on a node carrying traffic.
Step 1
Complete the
“DLP-A60 Log into CTC” task on page 17-66
at the node that will be the source node for
traffic traversing the third-party network. If you are already logged in, continue with Step 2.
Step 2
From the View menu, choose
Go to Network View
.
Step 3
Click the
Alarms
tab.
a.
Verify that the alarm filter is not on. See the
“DLP-A227 Disable Alarm Filtering” task on
as necessary.
b.
Verify that no unexplained alarms appear on the network. If unexplained alarms appear, resolve
them before continuing. Refer to the
Cisco ONS 15454 Troubleshooting Guide
if necessary.
c.
Complete the
“DLP-A516 Export CTC Data” task on page 22-6
to export the alarm information.
Purpose
This procedure tests an open-ended path protection.
Tools/Equipment
Test set and cables appropriate to the test circuit you will create.
Prerequisite Procedures
NTP-A224 Provision an Open-Ended Path Protection, page 5-31
Required/As Needed
As needed
Onsite/Remote
Onsite
Security Level
Provisioning and higher
Содержание ONS 15454 Series
Страница 28: ...Tables xxviii Cisco ONS 15454 Procedure Guide R5 0 December 2004 ...
Страница 44: ...Tasks xliv Cisco ONS 15454 Procedure Guide R5 0 December 2004 ...
Страница 53: ...liii Cisco ONS 15454 Procedure Guide R5 0 December 2004 About this Guide Document Conventions ...
Страница 55: ...lv Cisco ONS 15454 Procedure Guide R5 0 December 2004 About this Guide Document Conventions ...
Страница 126: ...4 14 Cisco ONS 15454 Procedure Guide R5 0 December 2004 Chapter 4 Turn Up Node NTP A256 Set Up SNMP ...
Страница 168: ...5 42 Cisco ONS 15454 Procedure Guide R5 0 December 2004 Chapter 5 Turn Up Network NTP A172 Create a Logical Network Map ...
Страница 304: ...10 8 Cisco ONS 15454 Procedure Guide R5 0 December 2004 Chapter 10 Change Node Settings NTP A87 Change SNMP Settings ...
Страница 410: ...16 4 Cisco ONS 15454 Procedure Guide R5 0 December 2004 Chapter 16 Power Down the Node NTP A114 Power Down the Node ...
Страница 510: ...17 100 Cisco ONS 15454 Procedure Guide R5 0 March 2005 Chapter 17 DLPs A1 to A99 DLP A99 Determine Available VLANs ...
Страница 746: ...20 102 Cisco ONS 15454 Procedure Guide R5 0 March 2005 Chapter 20 DLPs A300 to A399 DLP A399 Install a UBIC H EIA ...
Страница 828: ...A 14 Cisco ONS 15454 Procedure Guide R5 0 December 2004 Appendix A CTC Information and Shortcuts Equipment Inventory ...
Страница 850: ...Index IN 22 Cisco ONS 15454 Procedure Guide R5 0 December 2004 description 4 11 remove 18 23 ...