20-94
Cisco ONS 15454 Procedure Guide, R5.0
March 2005
Chapter 20 DLPs A300 to A399
DLP-A395 View BFDL PM Parameters for the DS3XM-12 Card
Note
Different port and signal-type drop-down lists appear depending on the card type and the circuit
type. The appropriate types (DS1, DS3, VT path, STS path) appear based on the card. For
example, the DS3XM-12 cards list DS3, DS1, VT path, and STS path PM parameters as signal
types. This enables you to select both the DS-3 port and the DS-1 within the specified DS-3.
Step 3
From the Request drop-down list choose one of the following:
•
Enhanced ES One Day
—Enhanced errored seconds performance data for one day.
•
Enhanced BES One Day
—Enhanced bursty errored seconds performance data for one day.
•
Enhanced SES One Day
—Enhanced severely errored seconds performance data for one day.
•
Enhanced UAS One Day
—Enhanced unavailable seconds performance data for one day.
•
Enhanced CSS/LOFC One Day
—Enhanced controlled slip seconds and loss of frame count
performance data for one day.
Note
The Request drop-down options are availableonly in DS1 ESF and BFDL modes. The
DS3XM-12 card can send requests for enhanced performance data to the far-end network
components. Enhanced performance data is displayed on CTC if the far-end network component
replies with the requested data. The normal response message will contain the current 15- minute
and current one-day PMs from Far-end for ES, UAS, BES, SES, CSS, and LOFC. If you select, for
example, Enhanced ES One Day from the Request drop-down list box, then CTC displays 96
15-minute PMs for ES and current PMs for BES, SES, UAS, CSS, and LOFC.
Step 4
In the signal type drop-down lists, choose the DS-3 port and the DS-1 port within the specified DS-3.
Step 5
Click
Refresh
.
Step 6
View the PM parameter names that appear in the Param column. The PM parameter values appear in the
Curr (current) and Prev-
n
(previous) columns. For PM parameter definitions, refer to the “Performance
Monitoring” chapter in the
Cisco ONS 15454 Troubleshooting Guide
.
To refresh, reset, or clear PM counts, see the
“NTP-A253 Change the PM Display” procedure on
Step 7
Return to your originating procedure (NTP).
Содержание ONS 15454 Series
Страница 28: ...Tables xxviii Cisco ONS 15454 Procedure Guide R5 0 December 2004 ...
Страница 44: ...Tasks xliv Cisco ONS 15454 Procedure Guide R5 0 December 2004 ...
Страница 53: ...liii Cisco ONS 15454 Procedure Guide R5 0 December 2004 About this Guide Document Conventions ...
Страница 55: ...lv Cisco ONS 15454 Procedure Guide R5 0 December 2004 About this Guide Document Conventions ...
Страница 126: ...4 14 Cisco ONS 15454 Procedure Guide R5 0 December 2004 Chapter 4 Turn Up Node NTP A256 Set Up SNMP ...
Страница 168: ...5 42 Cisco ONS 15454 Procedure Guide R5 0 December 2004 Chapter 5 Turn Up Network NTP A172 Create a Logical Network Map ...
Страница 304: ...10 8 Cisco ONS 15454 Procedure Guide R5 0 December 2004 Chapter 10 Change Node Settings NTP A87 Change SNMP Settings ...
Страница 410: ...16 4 Cisco ONS 15454 Procedure Guide R5 0 December 2004 Chapter 16 Power Down the Node NTP A114 Power Down the Node ...
Страница 510: ...17 100 Cisco ONS 15454 Procedure Guide R5 0 March 2005 Chapter 17 DLPs A1 to A99 DLP A99 Determine Available VLANs ...
Страница 746: ...20 102 Cisco ONS 15454 Procedure Guide R5 0 March 2005 Chapter 20 DLPs A300 to A399 DLP A399 Install a UBIC H EIA ...
Страница 828: ...A 14 Cisco ONS 15454 Procedure Guide R5 0 December 2004 Appendix A CTC Information and Shortcuts Equipment Inventory ...
Страница 850: ...Index IN 22 Cisco ONS 15454 Procedure Guide R5 0 December 2004 description 4 11 remove 18 23 ...