18-38
Cisco ONS 15454 Procedure Guide, R5.0
March 2007
Chapter 18 DLPs A100 to A199
DLP-A167 Change Line and Threshold Settings for the DS3-12E or DS3N-12E Cards
describes the values on the Provisioning > Line Thresholds tabs for the DS3E cards.
Admin
State
Sets the port service state unless network
conditions prevent the change.
•
IS—Puts the port in-service. The port
service state changes to IS-NR.
•
IS,AINS—Puts the port in automatic
in-service. The port service state
changes to OOS-AU,AINS.
•
OOS,DSBLD—Removes the port from
service and disables it. The port service
state changes to OOS-MA,DSBLD.
•
OOS,MT—Removes the port from
service for maintenance. The port
service state changes to OOS-MA,MT.
Service
State
Identifies the autonomously generated
state that gives the overall condition of
the port. Service states appear in the
format: Primary State-Primary State
Qualifier, Secondary State.
•
IS-NR—(In-Service and Normal) The
port is fully operational and performing
as provisioned.
•
OOS-AU,AINS—(Out-Of-Service and
Autonomous, Automatic In-Service)
The port is out-of-service, but traffic is
carried. Alarm reporting is suppressed.
The ONS node monitors the ports for an
error-free signal. After an error-free
signal is detected, the port stays in
OOS-AU,AINS state for the duration of
the soak period. After the soak period
ends, the port service state changes to
IS-NR.
•
OOS-MA,DSBLD—(Out-of-Service
and Management, Disabled) The port is
out-of-service and unable to carry
traffic.
•
OOS-MA,MT—(Out-of-Service and
Management, Maintenance) The port is
out-of-service for maintenance. Alarm
reporting is suppressed, but traffic is
carried and loopbacks are allowed.
AINS Soak
Sets the automatic in-service soak period.
•
Duration of valid input signal, in hh.mm
format, after which the card becomes in
service (IS) automatically
•
0 to 48 hours, 15-minute increments
Table 18-11
Line Options for the DS3-12E and DS3N-12E Cards (continued)
Parameter
Description
Options
Содержание ONS 15454 Series
Страница 28: ...Tables xxviii Cisco ONS 15454 Procedure Guide R5 0 December 2004 ...
Страница 44: ...Tasks xliv Cisco ONS 15454 Procedure Guide R5 0 December 2004 ...
Страница 53: ...liii Cisco ONS 15454 Procedure Guide R5 0 December 2004 About this Guide Document Conventions ...
Страница 55: ...lv Cisco ONS 15454 Procedure Guide R5 0 December 2004 About this Guide Document Conventions ...
Страница 126: ...4 14 Cisco ONS 15454 Procedure Guide R5 0 December 2004 Chapter 4 Turn Up Node NTP A256 Set Up SNMP ...
Страница 168: ...5 42 Cisco ONS 15454 Procedure Guide R5 0 December 2004 Chapter 5 Turn Up Network NTP A172 Create a Logical Network Map ...
Страница 304: ...10 8 Cisco ONS 15454 Procedure Guide R5 0 December 2004 Chapter 10 Change Node Settings NTP A87 Change SNMP Settings ...
Страница 410: ...16 4 Cisco ONS 15454 Procedure Guide R5 0 December 2004 Chapter 16 Power Down the Node NTP A114 Power Down the Node ...
Страница 510: ...17 100 Cisco ONS 15454 Procedure Guide R5 0 March 2005 Chapter 17 DLPs A1 to A99 DLP A99 Determine Available VLANs ...
Страница 746: ...20 102 Cisco ONS 15454 Procedure Guide R5 0 March 2005 Chapter 20 DLPs A300 to A399 DLP A399 Install a UBIC H EIA ...
Страница 828: ...A 14 Cisco ONS 15454 Procedure Guide R5 0 December 2004 Appendix A CTC Information and Shortcuts Equipment Inventory ...
Страница 850: ...Index IN 22 Cisco ONS 15454 Procedure Guide R5 0 December 2004 description 4 11 remove 18 23 ...