21-27
Cisco ONS 15454 Procedure Guide, R5.0
March 2005
Chapter 21 DLPs A400 to A499
DLP-A498 Switch Between TDM and DWDM Network Views
Step 1
Disconnect the network fiber cable from the GBIC SC connector or SFP LC duplex connector. If the SFP
connector has a latch securing the fiber cable, pull it upward to release the cable.
Step 2
If you are using a GBIC with clips:
a.
Release the GBIC from the slot by squeezing the two plastic tabs on each side of the GBIC.
b.
Slide the GBIC out of the slot. A flap closes over the slot to protect the connector on the
Gigabit Ethernet card.
Step 3
If you are using a GBIC with a handle:
a.
Release the GBIC by opening the handle.
b.
Pull the handle of the GBIC.
c.
Slide the GBIC out of the slot. A flap closes over the slot to protect the connector on the Gigabit
Ethernet card.
Step 4
If you are using an SFP:
a.
If the SFP connector has a latch securing the fiber cable, pull it upward to release the cable.
b.
Pull the fiber cable straight out of the connector.
c.
Unplug the SFP connector and fiber from the card.
d.
Slide the SFP out of the slot.
Step 5
Return to your originating procedure (NTP).
DLP-A498 Switch Between TDM and DWDM Network Views
Step 1
From the View menu, choose
Go to Network View
.
Step 2
From the Network Scope drop-down list on the toolbar, choose one of the following:
•
All
—Displays both TDM and DWDM nodes.
•
TDM
—Displays only ONS 15454s with SONET or SDH cards including the transponder (TXP) and
muxponder (MXP) cards.
•
DWDM
—Displays only ONS 15454s with DWDM cards, including the transponder and muxponder
cards.
Note
For information about DWDM, TXP, and MXP cards, refer to the
Cisco ONS 15454 DWDM
Installation and Operations Guide
.
Purpose
Use this task to switch between time division multiplexing (TDM) and
DWDM network views.
Tools/Equipment
None
Prerequisite procedures
DLP-A60 Log into CTC, page 17-66
Required/As needed
As needed
Onsite/Remote
Onsite or remote
Security Level
Retrieve or higher
Содержание ONS 15454 Series
Страница 28: ...Tables xxviii Cisco ONS 15454 Procedure Guide R5 0 December 2004 ...
Страница 44: ...Tasks xliv Cisco ONS 15454 Procedure Guide R5 0 December 2004 ...
Страница 53: ...liii Cisco ONS 15454 Procedure Guide R5 0 December 2004 About this Guide Document Conventions ...
Страница 55: ...lv Cisco ONS 15454 Procedure Guide R5 0 December 2004 About this Guide Document Conventions ...
Страница 126: ...4 14 Cisco ONS 15454 Procedure Guide R5 0 December 2004 Chapter 4 Turn Up Node NTP A256 Set Up SNMP ...
Страница 168: ...5 42 Cisco ONS 15454 Procedure Guide R5 0 December 2004 Chapter 5 Turn Up Network NTP A172 Create a Logical Network Map ...
Страница 304: ...10 8 Cisco ONS 15454 Procedure Guide R5 0 December 2004 Chapter 10 Change Node Settings NTP A87 Change SNMP Settings ...
Страница 410: ...16 4 Cisco ONS 15454 Procedure Guide R5 0 December 2004 Chapter 16 Power Down the Node NTP A114 Power Down the Node ...
Страница 510: ...17 100 Cisco ONS 15454 Procedure Guide R5 0 March 2005 Chapter 17 DLPs A1 to A99 DLP A99 Determine Available VLANs ...
Страница 746: ...20 102 Cisco ONS 15454 Procedure Guide R5 0 March 2005 Chapter 20 DLPs A300 to A399 DLP A399 Install a UBIC H EIA ...
Страница 828: ...A 14 Cisco ONS 15454 Procedure Guide R5 0 December 2004 Appendix A CTC Information and Shortcuts Equipment Inventory ...
Страница 850: ...Index IN 22 Cisco ONS 15454 Procedure Guide R5 0 December 2004 description 4 11 remove 18 23 ...