Tasks
xli
Cisco ONS 15454 Procedure Guide, R5.0
December 2004
A330 Preprovision a Slot
20-20
A332 Change Tunnel Type
20-20
A333 Delete Circuits
20-21
A334 Delete Overhead Circuits
20-22
A335 Delete VLANs
20-23
A336 Repair an IP Tunnel
20-23
A337 Run the CTC Installation Wizard for Windows
20-24
A338 Run the CTC Installation Wizard for UNIX
20-27
A339 Delete a Node from the Current Session or Login Group
20-30
A340 View Port Status on the LCD
20-31
A341 Create an IP-Encapsulated Tunnel
20-32
A347 Refresh E-Series and G-Series Ethernet PM Counts
20-33
A348 Monitor PM Counts for a Selected Signal
20-34
A349 Clear Selected PM Counts
20-35
A350 View FC_MR-4 Statistics PM Parameters
20-36
A351 View FC_MR-4 Utilization PM Parameters
20-37
A352 View FC_MR-4 History PM Parameters
20-38
A353 Refresh FC_MR-4 PM Counts at a Different Time Interval
20-39
A356 TCC2/TCC2P Card Active/Standby Switch Test
20-40
A357 Create FC_MR-4 RMON Alarm Thresholds
20-41
A358 Delete FC_MR-4 RMON Alarm Thresholds
20-45
A359 Delete a Line DCC Termination
20-45
A362 Create a Four-Fiber BLSR Using the BLSR Wizard
20-46
A363 Create a Four-Fiber BLSR Manually
20-48
A364 Reset the TCC2/TCC2P Card Using CTC
20-49
A365 Initiate an Optical Protection Switch
20-50
A366 Initiate an Electrical Protection Switch
20-50
A367 Create a Provisionable Patchcord
20-51
A368 Delete a Provisionable Patchcord
20-52
A369 Provision an OC-N Circuit Route
20-53
A371 Remove Pass-through Connections
20-55
A372 Delete a Node from a Specified Login Node Group
20-56
A373 Install a MiniBNC EIA
20-57
A374 Change a Section DCC Termination
20-60
A375 Change a Line DCC Termination
20-60
Содержание ONS 15454 Series
Страница 28: ...Tables xxviii Cisco ONS 15454 Procedure Guide R5 0 December 2004 ...
Страница 44: ...Tasks xliv Cisco ONS 15454 Procedure Guide R5 0 December 2004 ...
Страница 53: ...liii Cisco ONS 15454 Procedure Guide R5 0 December 2004 About this Guide Document Conventions ...
Страница 55: ...lv Cisco ONS 15454 Procedure Guide R5 0 December 2004 About this Guide Document Conventions ...
Страница 126: ...4 14 Cisco ONS 15454 Procedure Guide R5 0 December 2004 Chapter 4 Turn Up Node NTP A256 Set Up SNMP ...
Страница 168: ...5 42 Cisco ONS 15454 Procedure Guide R5 0 December 2004 Chapter 5 Turn Up Network NTP A172 Create a Logical Network Map ...
Страница 304: ...10 8 Cisco ONS 15454 Procedure Guide R5 0 December 2004 Chapter 10 Change Node Settings NTP A87 Change SNMP Settings ...
Страница 410: ...16 4 Cisco ONS 15454 Procedure Guide R5 0 December 2004 Chapter 16 Power Down the Node NTP A114 Power Down the Node ...
Страница 510: ...17 100 Cisco ONS 15454 Procedure Guide R5 0 March 2005 Chapter 17 DLPs A1 to A99 DLP A99 Determine Available VLANs ...
Страница 746: ...20 102 Cisco ONS 15454 Procedure Guide R5 0 March 2005 Chapter 20 DLPs A300 to A399 DLP A399 Install a UBIC H EIA ...
Страница 828: ...A 14 Cisco ONS 15454 Procedure Guide R5 0 December 2004 Appendix A CTC Information and Shortcuts Equipment Inventory ...
Страница 850: ...Index IN 22 Cisco ONS 15454 Procedure Guide R5 0 December 2004 description 4 11 remove 18 23 ...