20-32
Cisco ONS 15454 Procedure Guide, R5.0
March 2005
Chapter 20 DLPs A300 to A399
DLP-A341 Create an IP-Encapsulated Tunnel
DLP-A341 Create an IP-Encapsulated Tunnel
Note
Each ONS 15454 can have up to ten IP-encapsulated tunnel connections. Terminated SDCCs used by the
ONS 15454 cannot be used as a tunnel endpoint, and a SDCC that is used as a tunnel endpoint cannot
be terminated. All tunnel connections are bidirectional.
Step 1
Verify that IP addresses are provisioned at both the source and destination nodes of the planned tunnel.
For more information, see the
“DLP-A249 Provision IP Settings” task on page 19-30
.
Step 2
In network view, click the
Provisioning > Overhead Circuits
tabs.
Step 3
Click
Create
.
Step 4
In the Overhead Circuit Creation dialog box, complete the following in the Circuit Attributes area:
•
Name—Type the tunnel name.
•
Type—Choose
IP Tunnel-D1-D3
.
•
Maximum Bandwidth—Type the percentage of total SDCC bandwidth used in the IP tunnel (the
minimum percentage is 10 percent).
Step 5
Click
Next
.
Step 6
In the Circuit Source area, complete the following:
•
Node—Choose the source node.
•
Slot—Choose the source slot.
•
Port—If displayed, choose the source port.
•
Channel—Displays IPT (D1-D3).
Step 7
Click
Next
.
Step 8
In the Circuit Destination area, complete the following:
•
Node—Choose the destination node.
•
Slot—Choose the destination slot.
•
Port—If displayed, choose the destination port.
•
Channel—Displays IPT (D1-D3).
Step 9
Click
Finish
.
Step 10
Put the ports that are hosting the IP-encapsulated tunnel in service. See the
Service State for a Port” task on page 19-9
for instructions.
Purpose
This task creates a an IP-encapsulated tunnel to transport traffic from
third-party SONET equipment across ONS 15454 networks.
IP-encapsulated tunnels are created on the SDCC channel (D1-D3) (if not
used by the ONS 15454 as a terminated DCC).
Tools/Equipment
OC-N cards must be installed.
Prerequisite Procedures
NTP-A35 Verify Node Turn-Up, page 5-2
Required/As Needed
As needed
Onsite/Remote
Onsite or remote
Security Level
Provisioning or higher
Содержание ONS 15454 Series
Страница 28: ...Tables xxviii Cisco ONS 15454 Procedure Guide R5 0 December 2004 ...
Страница 44: ...Tasks xliv Cisco ONS 15454 Procedure Guide R5 0 December 2004 ...
Страница 53: ...liii Cisco ONS 15454 Procedure Guide R5 0 December 2004 About this Guide Document Conventions ...
Страница 55: ...lv Cisco ONS 15454 Procedure Guide R5 0 December 2004 About this Guide Document Conventions ...
Страница 126: ...4 14 Cisco ONS 15454 Procedure Guide R5 0 December 2004 Chapter 4 Turn Up Node NTP A256 Set Up SNMP ...
Страница 168: ...5 42 Cisco ONS 15454 Procedure Guide R5 0 December 2004 Chapter 5 Turn Up Network NTP A172 Create a Logical Network Map ...
Страница 304: ...10 8 Cisco ONS 15454 Procedure Guide R5 0 December 2004 Chapter 10 Change Node Settings NTP A87 Change SNMP Settings ...
Страница 410: ...16 4 Cisco ONS 15454 Procedure Guide R5 0 December 2004 Chapter 16 Power Down the Node NTP A114 Power Down the Node ...
Страница 510: ...17 100 Cisco ONS 15454 Procedure Guide R5 0 March 2005 Chapter 17 DLPs A1 to A99 DLP A99 Determine Available VLANs ...
Страница 746: ...20 102 Cisco ONS 15454 Procedure Guide R5 0 March 2005 Chapter 20 DLPs A300 to A399 DLP A399 Install a UBIC H EIA ...
Страница 828: ...A 14 Cisco ONS 15454 Procedure Guide R5 0 December 2004 Appendix A CTC Information and Shortcuts Equipment Inventory ...
Страница 850: ...Index IN 22 Cisco ONS 15454 Procedure Guide R5 0 December 2004 description 4 11 remove 18 23 ...