14-16
Cisco ONS 15454 Procedure Guide, R5.0
December 2004
Chapter 14 Add and Remove Nodes
NTP-A312 Add a Node to a Linear ADM Using the Wizard
Step 9
Click
Next
. The Re-fiber the Protected Path dialog box appears (
Figure 14-5
Refibering the Protect Path
Step 10
Follow the instructions in the dialog box for connecting the fibers between the nodes.
Step 11
When the fibers are connected properly, click
Next
. The Update Circuit(s) on
Node-Name
dialog box
appears.
Note
The Back button is not enabled in the wizard. You can click the
Cancel
button at this point and
choose the
Yes
button if you want to cancel the upgrade protection procedure. If the procedure
fails after you have physically moved the fiber-optic cables, you will need to restore the cables
to the original positions and verify through CTC that traffic is on the working path of the nodes
before restarting the process. To check traffic status, go to node view and click the
Maintenance
> Protection
tabs. In the Protection Groups area, click the 1+1 protection group. You can see
the status of the traffic in the Selected Group area.
Step 12
Click
Next
on the Update Circuit(s) on
Node-Name
page to continue with the procedure.
Step 13
The Force Traffic to Protect Path page states that it is about to force the traffic from the working to
protect path for the terminal nodes. When you are ready to proceed, click
Next
.
Step 14
Follow each step as instructed by the wizard as it guides you through the process of re-fibering the
working path between nodes and forcing the traffic back to the working path.
Step 15
The Force Traffic to Working Path page states that it is about to force the traffic from the protect to
working path for the terminal nodes. When you are ready to proceed, click
Next
.
Step 16
The Completed page appears. This page is the final one in the process. Click
Finish.
Stop. You have completed this procedure.
Содержание ONS 15454 Series
Страница 28: ...Tables xxviii Cisco ONS 15454 Procedure Guide R5 0 December 2004 ...
Страница 44: ...Tasks xliv Cisco ONS 15454 Procedure Guide R5 0 December 2004 ...
Страница 53: ...liii Cisco ONS 15454 Procedure Guide R5 0 December 2004 About this Guide Document Conventions ...
Страница 55: ...lv Cisco ONS 15454 Procedure Guide R5 0 December 2004 About this Guide Document Conventions ...
Страница 126: ...4 14 Cisco ONS 15454 Procedure Guide R5 0 December 2004 Chapter 4 Turn Up Node NTP A256 Set Up SNMP ...
Страница 168: ...5 42 Cisco ONS 15454 Procedure Guide R5 0 December 2004 Chapter 5 Turn Up Network NTP A172 Create a Logical Network Map ...
Страница 304: ...10 8 Cisco ONS 15454 Procedure Guide R5 0 December 2004 Chapter 10 Change Node Settings NTP A87 Change SNMP Settings ...
Страница 410: ...16 4 Cisco ONS 15454 Procedure Guide R5 0 December 2004 Chapter 16 Power Down the Node NTP A114 Power Down the Node ...
Страница 510: ...17 100 Cisco ONS 15454 Procedure Guide R5 0 March 2005 Chapter 17 DLPs A1 to A99 DLP A99 Determine Available VLANs ...
Страница 746: ...20 102 Cisco ONS 15454 Procedure Guide R5 0 March 2005 Chapter 20 DLPs A300 to A399 DLP A399 Install a UBIC H EIA ...
Страница 828: ...A 14 Cisco ONS 15454 Procedure Guide R5 0 December 2004 Appendix A CTC Information and Shortcuts Equipment Inventory ...
Страница 850: ...Index IN 22 Cisco ONS 15454 Procedure Guide R5 0 December 2004 description 4 11 remove 18 23 ...