Chapter 1 Install the Shelf and Backplane Cable
NTP-A120 Install an External Wire-Wrap Panel to the AEP
Step 4
Complete the
“DLP-A22 Install the TL1 Craft Interface” task on page 17-27
as needed. Craft wires (or
the EIA/TIA-232 port on the TCC2/TCC2P) are required to access TL1 using the craft interface.
Caution
Always use the supplied ESD wristband when working with a powered ONS 15454. Plug the
wristband cable into the ESD jack located on the lower-right outside edge of the shelf
assembly.
Step 5
Complete one of the following:
•
If you installed an AEP, continue with the
“NTP-A120 Install an External Wire-Wrap Panel to the
.
•
If you did not install an AEP and you plan to install electrical cards, continue with the
Install the Electrical Card Cables on the Backplane” procedure on page 1-21
.
•
If you did not install an AEP and do not plan to install electrical cards, continue with the
Install the Rear Cover” procedure on page 1-22
.
Stop. You have completed this procedure.
NTP-A120 Install an External Wire-Wrap Panel to the AEP
Step 1
Position the lower cover over the AEP. Make sure that the AEP AMP Champ connectors protrude
through the cutouts in the lower cover (
).
Purpose
This procedure connects an external wire-wrap panel to the AEP to provide
the physical alarm contacts for the AEP.
Tools/Equipment
External wire-wrap panel
Prerequisite Procedures
NTP-A119 Install the Alarm Expansion Panel, page 1-12
Required/As Needed
As needed
Onsite/Remote
Onsite
Security Level
None
Содержание ONS 15454 Series
Страница 28: ...Tables xxviii Cisco ONS 15454 Procedure Guide R5 0 December 2004 ...
Страница 44: ...Tasks xliv Cisco ONS 15454 Procedure Guide R5 0 December 2004 ...
Страница 53: ...liii Cisco ONS 15454 Procedure Guide R5 0 December 2004 About this Guide Document Conventions ...
Страница 55: ...lv Cisco ONS 15454 Procedure Guide R5 0 December 2004 About this Guide Document Conventions ...
Страница 126: ...4 14 Cisco ONS 15454 Procedure Guide R5 0 December 2004 Chapter 4 Turn Up Node NTP A256 Set Up SNMP ...
Страница 168: ...5 42 Cisco ONS 15454 Procedure Guide R5 0 December 2004 Chapter 5 Turn Up Network NTP A172 Create a Logical Network Map ...
Страница 304: ...10 8 Cisco ONS 15454 Procedure Guide R5 0 December 2004 Chapter 10 Change Node Settings NTP A87 Change SNMP Settings ...
Страница 410: ...16 4 Cisco ONS 15454 Procedure Guide R5 0 December 2004 Chapter 16 Power Down the Node NTP A114 Power Down the Node ...
Страница 510: ...17 100 Cisco ONS 15454 Procedure Guide R5 0 March 2005 Chapter 17 DLPs A1 to A99 DLP A99 Determine Available VLANs ...
Страница 746: ...20 102 Cisco ONS 15454 Procedure Guide R5 0 March 2005 Chapter 20 DLPs A300 to A399 DLP A399 Install a UBIC H EIA ...
Страница 828: ...A 14 Cisco ONS 15454 Procedure Guide R5 0 December 2004 Appendix A CTC Information and Shortcuts Equipment Inventory ...
Страница 850: ...Index IN 22 Cisco ONS 15454 Procedure Guide R5 0 December 2004 description 4 11 remove 18 23 ...