1-21
Cisco ONS 15454 Procedure Guide, R5.0
March 2005
Chapter 1 Install the Shelf and Backplane Cable
NTP-A9 Install the Electrical Card Cables on the Backplane
NTP-A9 Install the Electrical Card Cables on the Backplane
Caution
Always use the supplied ESD wristband when working with a powered ONS 15454. Plug the wristband
cable into the ESD jack located on the lower-right outside edge of the shelf assembly.
Note
Refer to the
Cisco ONS 15454 Reference Manual
for more information about EIAs.
Step 1
Complete the
“DLP-A530 Install the Tie-Down Bar” task on page 22-27
as needed for routing the
electrical cables you will install.
Step 2
Complete the
“DLP-A23 Install DS-1 Cables Using Electrical Interface Adapters (Balun)” task on
as needed. Baluns are used on SMB EIAs to properly terminate DS-1 signals.
Step 3
To install DS-1 cables using AMP Champ cables, complete the
“DLP-A24 Install DS-1 AMP Champ
Cables on the AMP Champ EIA” task on page 17-29
Step 4
Complete the
“DLP-A25 Install Coaxial Cable With BNC Connectors” task on page 17-32
Step 5
Complete the
“DLP-A26 Install Coaxial Cable With High-Density BNC Connectors” task on page 17-33
as needed.
Step 6
Complete the
“DLP-A27 Install Coaxial Cable with SMB Connectors” task on page 17-33
as needed.
Step 7
Complete the
“DLP-A386 Install Electrical Cables on the UBIC-V EIAs” task on page 20-70
as needed.
Step 8
Complete the
“DLP-A441 Install Electrical Cables on the UBIC-H EIAs” task on page 21-21
as needed.
Step 9
Continue with the
“NTP-A10 Route Electrical Cables” procedure on page 1-22
Stop. You have completed this procedure.
Purpose
Optional EIA backplane covers are typically preinstalled when ordered
with the ONS 15454. The following procedure describes how to install the
electrical card cables to the backplane. If the shelf was not shipped with the
correct EIA interface, you must order and install the correct EIA.
Tools/Equipment
Wire wrapper
Twisted-pair cables
BNC insertion tool
SMB cable connector
#2 Phillips screwdriver
Medium slot-head screwdriver
DS-1 and DS-3 cables, as needed
Tie-down bar, as needed
Prerequisite Procedures
NTP-A5 Install the EIAs, page 1-7
Required/As Needed
As needed
Onsite/Remote
Onsite
Security Level
None
Содержание ONS 15454 Series
Страница 28: ...Tables xxviii Cisco ONS 15454 Procedure Guide R5 0 December 2004 ...
Страница 44: ...Tasks xliv Cisco ONS 15454 Procedure Guide R5 0 December 2004 ...
Страница 53: ...liii Cisco ONS 15454 Procedure Guide R5 0 December 2004 About this Guide Document Conventions ...
Страница 55: ...lv Cisco ONS 15454 Procedure Guide R5 0 December 2004 About this Guide Document Conventions ...
Страница 126: ...4 14 Cisco ONS 15454 Procedure Guide R5 0 December 2004 Chapter 4 Turn Up Node NTP A256 Set Up SNMP ...
Страница 168: ...5 42 Cisco ONS 15454 Procedure Guide R5 0 December 2004 Chapter 5 Turn Up Network NTP A172 Create a Logical Network Map ...
Страница 304: ...10 8 Cisco ONS 15454 Procedure Guide R5 0 December 2004 Chapter 10 Change Node Settings NTP A87 Change SNMP Settings ...
Страница 410: ...16 4 Cisco ONS 15454 Procedure Guide R5 0 December 2004 Chapter 16 Power Down the Node NTP A114 Power Down the Node ...
Страница 510: ...17 100 Cisco ONS 15454 Procedure Guide R5 0 March 2005 Chapter 17 DLPs A1 to A99 DLP A99 Determine Available VLANs ...
Страница 746: ...20 102 Cisco ONS 15454 Procedure Guide R5 0 March 2005 Chapter 20 DLPs A300 to A399 DLP A399 Install a UBIC H EIA ...
Страница 828: ...A 14 Cisco ONS 15454 Procedure Guide R5 0 December 2004 Appendix A CTC Information and Shortcuts Equipment Inventory ...
Страница 850: ...Index IN 22 Cisco ONS 15454 Procedure Guide R5 0 December 2004 description 4 11 remove 18 23 ...