1-22
Cisco ONS 15454 Procedure Guide, R5.0
March 2005
Chapter 1 Install the Shelf and Backplane Cable
NTP-A10 Route Electrical Cables
NTP-A10 Route Electrical Cables
Step 1
Complete the
“DLP-A28 Route Coaxial Cables” task on page 17-35
as needed.
Step 2
Complete the
“DLP-A29 Route DS-1 and DS-3/EC-1 Twisted-Pair Cables” task on page 17-36
as
needed.
Step 3
Continue with the
“NTP-A11 Install the Rear Cover” procedure on page 1-22
Stop. You have completed this procedure.
NTP-A11 Install the Rear Cover
Step 1
Identify the EIA type where you will install the rear cover.
Step 2
According to
, assemble the extended standoffs for that EIA type. Start with a 1 3/8-inch
standoff and attach the other standoff(s) to that standoff to create an extended standoff. You should
assemble two extended standoffs for each side, for a total of four extended standoffs per shelf.
Purpose
This procedure routes and manages electrical (backplane) cables.
Tools/Equipment
RG179, RG59 (735A) #26 AWG cable, or RG59 (734A) #20 AWG cable
Prerequisite Procedures
NTP-A9 Install the Electrical Card Cables on the Backplane, page 1-21
Required/As Needed
As needed
Onsite/Remote
Onsite
Security Level
None
Purpose
This procedure explains how to install the rear cover.
Tools/Equipment
#2 Phillips screwdriver
5/16-inch nut driver
Shelf accessory kit (53-2329-XX )
•
Two mounting bars (700-19701-XX)
•
Four 1-inch standoffs (50-1193-01)
•
Four 1 3/8-inch standoffs (50-1492-01)
•
Eight 2-inch standoffs (50-1453-01)
•
Four flathead screws, 6-32 x 0.5 (48-2116-01)
Plastic rear cover (700-06029-XX)
Prerequisite Procedures
NTP-A3 Open and Remove the Front Door, page 1-6
Required/As Needed
Required
Onsite/Remote
Onsite
Security Level
None
Содержание ONS 15454 Series
Страница 28: ...Tables xxviii Cisco ONS 15454 Procedure Guide R5 0 December 2004 ...
Страница 44: ...Tasks xliv Cisco ONS 15454 Procedure Guide R5 0 December 2004 ...
Страница 53: ...liii Cisco ONS 15454 Procedure Guide R5 0 December 2004 About this Guide Document Conventions ...
Страница 55: ...lv Cisco ONS 15454 Procedure Guide R5 0 December 2004 About this Guide Document Conventions ...
Страница 126: ...4 14 Cisco ONS 15454 Procedure Guide R5 0 December 2004 Chapter 4 Turn Up Node NTP A256 Set Up SNMP ...
Страница 168: ...5 42 Cisco ONS 15454 Procedure Guide R5 0 December 2004 Chapter 5 Turn Up Network NTP A172 Create a Logical Network Map ...
Страница 304: ...10 8 Cisco ONS 15454 Procedure Guide R5 0 December 2004 Chapter 10 Change Node Settings NTP A87 Change SNMP Settings ...
Страница 410: ...16 4 Cisco ONS 15454 Procedure Guide R5 0 December 2004 Chapter 16 Power Down the Node NTP A114 Power Down the Node ...
Страница 510: ...17 100 Cisco ONS 15454 Procedure Guide R5 0 March 2005 Chapter 17 DLPs A1 to A99 DLP A99 Determine Available VLANs ...
Страница 746: ...20 102 Cisco ONS 15454 Procedure Guide R5 0 March 2005 Chapter 20 DLPs A300 to A399 DLP A399 Install a UBIC H EIA ...
Страница 828: ...A 14 Cisco ONS 15454 Procedure Guide R5 0 December 2004 Appendix A CTC Information and Shortcuts Equipment Inventory ...
Страница 850: ...Index IN 22 Cisco ONS 15454 Procedure Guide R5 0 December 2004 description 4 11 remove 18 23 ...