17-36
Cisco ONS 15454 Procedure Guide, R5.0
March 2005
Chapter 17 DLPs A1 to A99
DLP-A29 Route DS-1 and DS-3/EC-1 Twisted-Pair Cables
Figure 17-17
Routing Coaxial Cable (SMB EIA Backplane)
Step 4
Return to your originating procedure (NTP).
DLP-A29 Route DS-1 and DS-3/EC-1 Twisted-Pair Cables
Step 1
Verify the following:
•
DS-1 electrical interface adapters are installed on every transmit and receive connector for DS-1
ports.
•
Wire-wrap posts on the DS-1 electrical interface adapters are used to connect the terminated
incoming cables.
Step 2
Tie-wrap or lace the DS-1 and DS-3/EC-1 twisted-pair cables according to local site practice and route
the cables into the side cutouts on either side of the ONS 15454.
Purpose
This task routes the DS-1 and DS-3/EC-1 twisted-pair cables.
Tools/Equipment
None
Prerequisite Procedures
DLP-A23 Install DS-1 Cables Using Electrical Interface Adapters (Balun),
page 17-28
Required/As Needed
As needed
Onsite/Remote
Onsite
Security Level
None
B
A
Connector ends
Tie-wrap
posts
32079
Tie-wraps
Содержание ONS 15454 Series
Страница 28: ...Tables xxviii Cisco ONS 15454 Procedure Guide R5 0 December 2004 ...
Страница 44: ...Tasks xliv Cisco ONS 15454 Procedure Guide R5 0 December 2004 ...
Страница 53: ...liii Cisco ONS 15454 Procedure Guide R5 0 December 2004 About this Guide Document Conventions ...
Страница 55: ...lv Cisco ONS 15454 Procedure Guide R5 0 December 2004 About this Guide Document Conventions ...
Страница 126: ...4 14 Cisco ONS 15454 Procedure Guide R5 0 December 2004 Chapter 4 Turn Up Node NTP A256 Set Up SNMP ...
Страница 168: ...5 42 Cisco ONS 15454 Procedure Guide R5 0 December 2004 Chapter 5 Turn Up Network NTP A172 Create a Logical Network Map ...
Страница 304: ...10 8 Cisco ONS 15454 Procedure Guide R5 0 December 2004 Chapter 10 Change Node Settings NTP A87 Change SNMP Settings ...
Страница 410: ...16 4 Cisco ONS 15454 Procedure Guide R5 0 December 2004 Chapter 16 Power Down the Node NTP A114 Power Down the Node ...
Страница 510: ...17 100 Cisco ONS 15454 Procedure Guide R5 0 March 2005 Chapter 17 DLPs A1 to A99 DLP A99 Determine Available VLANs ...
Страница 746: ...20 102 Cisco ONS 15454 Procedure Guide R5 0 March 2005 Chapter 20 DLPs A300 to A399 DLP A399 Install a UBIC H EIA ...
Страница 828: ...A 14 Cisco ONS 15454 Procedure Guide R5 0 December 2004 Appendix A CTC Information and Shortcuts Equipment Inventory ...
Страница 850: ...Index IN 22 Cisco ONS 15454 Procedure Guide R5 0 December 2004 description 4 11 remove 18 23 ...