1-12
Cisco ONS 15454 Procedure Guide, R5.0
March 2005
Chapter 1 Install the Shelf and Backplane Cable
NTP-A119 Install the Alarm Expansion Panel
Figure 1-1
Installing the Fan-Tray Assembly
Step 4
Continue with the
“NTP-A119 Install the Alarm Expansion Panel” procedure on page 1-12
if you plan
to install an alarm expansion panel (AEP). If not, continue with the
“NTP-A8 Attach Wires to Alarm,
Timing, LAN, and Craft Pin Connections” procedure on page 1-15
.
Stop. You have completed this procedure.
NTP-A119 Install the Alarm Expansion Panel
FA
N FA
IL
CRIT
MAJ
MIN
38532
Fan tray
assembly
LCD
Purpose
This procedure installs an alarm expansion panel (AEP) onto the
15454-SA-ANSI or 15454-SA-HD shelf backplane. The AEP provides
alarm contacts in addition to the 16 provided by the AIC-I card. Typically,
the AEP is preinstalled when ordered with the ONS 15454; however, the
AEP can be ordered separately. The AIC-I card must be installed before
you can provision the alarm contacts enabled by the AEP.
Tools/Equipment
#2 Phillips screwdriver
Medium slot-head screwdriver
Small slot-head screwdriver
Wire wrapper
6-pair #29 AWG double-shielded cable
Standoffs (4)
Prerequisite Procedures
DLP-A10 Remove the Lower Backplane Cover, page 17-10
Required/As Needed
As needed
Содержание ONS 15454 Series
Страница 28: ...Tables xxviii Cisco ONS 15454 Procedure Guide R5 0 December 2004 ...
Страница 44: ...Tasks xliv Cisco ONS 15454 Procedure Guide R5 0 December 2004 ...
Страница 53: ...liii Cisco ONS 15454 Procedure Guide R5 0 December 2004 About this Guide Document Conventions ...
Страница 55: ...lv Cisco ONS 15454 Procedure Guide R5 0 December 2004 About this Guide Document Conventions ...
Страница 126: ...4 14 Cisco ONS 15454 Procedure Guide R5 0 December 2004 Chapter 4 Turn Up Node NTP A256 Set Up SNMP ...
Страница 168: ...5 42 Cisco ONS 15454 Procedure Guide R5 0 December 2004 Chapter 5 Turn Up Network NTP A172 Create a Logical Network Map ...
Страница 304: ...10 8 Cisco ONS 15454 Procedure Guide R5 0 December 2004 Chapter 10 Change Node Settings NTP A87 Change SNMP Settings ...
Страница 410: ...16 4 Cisco ONS 15454 Procedure Guide R5 0 December 2004 Chapter 16 Power Down the Node NTP A114 Power Down the Node ...
Страница 510: ...17 100 Cisco ONS 15454 Procedure Guide R5 0 March 2005 Chapter 17 DLPs A1 to A99 DLP A99 Determine Available VLANs ...
Страница 746: ...20 102 Cisco ONS 15454 Procedure Guide R5 0 March 2005 Chapter 20 DLPs A300 to A399 DLP A399 Install a UBIC H EIA ...
Страница 828: ...A 14 Cisco ONS 15454 Procedure Guide R5 0 December 2004 Appendix A CTC Information and Shortcuts Equipment Inventory ...
Страница 850: ...Index IN 22 Cisco ONS 15454 Procedure Guide R5 0 December 2004 description 4 11 remove 18 23 ...