14-3
Cisco ONS 15454 Procedure Guide, R5.0
December 2004
Chapter 14 Add and Remove Nodes
NTP-A212 Add a BLSR Node
shows a sample drawing of a three-node, four-fiber BLSR. The dashed arrow shows the new
fiber connections that will be made to add the fourth node. For four-fiber BLSRs, two fiber sets will be
reconnected, the working fiber and the protect fiber.
Figure 14-2
Three-Node, Four-Fiber BLSR Before a Fourth Node is Added
Step 2
According to local site practice, complete the
“NTP-A108 Back Up the Database” procedure on
for all the nodes in the ring.
Step 3
Verify the card installation on the new node using the
“NTP-A24 Verify Card Installation” procedure on
. Verify that the OC-N cards that will be the BLSR trunk cards match the BLSR optical rate. For
example, if the BLSR is OC-48, the new node must have OC-48 cards installed. If the OC-N cards are
not installed or the optical rates do not match the BLSR, complete the
.
Step 4
Verify that fiber is available to connect the new node to the existing nodes. Refer to the diagram drawn
in
Step 5
Complete the
“NTP-A35 Verify Node Turn-Up” procedure on page 5-2
. In order to have CTC visibility
to the new node after it is added, you must be an authorized user on the node and you must have IP
connectivity to the node.
Step 6
Create a static route on the new node if the following conditions are present. If the conditions are not
present, continue with
.
•
The IP address for the new node is on the same subnet as other nodes in the network.
•
On the new node Provisioning > Network > General subtab, Craft Access Only is not checked under
Gateway Settings.
78741
Node 1
West
East
West
East
West
East
West
East
Slot
5
Slot
12
New Node
Slot
5
Slot
12
Node 2
Slot
5
Slot
12
Node 3
Slot
5
Slot
12
Tx
Rx
Slot
6
Slot
13
Tx
Rx
Slot
6
Slot
13
Tx
Rx
Slot
6
Slot
13
Tx
Rx
Slot
6
Slot
13
Working fibers
Protect fibers
New fiber connections
Содержание ONS 15454 Series
Страница 28: ...Tables xxviii Cisco ONS 15454 Procedure Guide R5 0 December 2004 ...
Страница 44: ...Tasks xliv Cisco ONS 15454 Procedure Guide R5 0 December 2004 ...
Страница 53: ...liii Cisco ONS 15454 Procedure Guide R5 0 December 2004 About this Guide Document Conventions ...
Страница 55: ...lv Cisco ONS 15454 Procedure Guide R5 0 December 2004 About this Guide Document Conventions ...
Страница 126: ...4 14 Cisco ONS 15454 Procedure Guide R5 0 December 2004 Chapter 4 Turn Up Node NTP A256 Set Up SNMP ...
Страница 168: ...5 42 Cisco ONS 15454 Procedure Guide R5 0 December 2004 Chapter 5 Turn Up Network NTP A172 Create a Logical Network Map ...
Страница 304: ...10 8 Cisco ONS 15454 Procedure Guide R5 0 December 2004 Chapter 10 Change Node Settings NTP A87 Change SNMP Settings ...
Страница 410: ...16 4 Cisco ONS 15454 Procedure Guide R5 0 December 2004 Chapter 16 Power Down the Node NTP A114 Power Down the Node ...
Страница 510: ...17 100 Cisco ONS 15454 Procedure Guide R5 0 March 2005 Chapter 17 DLPs A1 to A99 DLP A99 Determine Available VLANs ...
Страница 746: ...20 102 Cisco ONS 15454 Procedure Guide R5 0 March 2005 Chapter 20 DLPs A300 to A399 DLP A399 Install a UBIC H EIA ...
Страница 828: ...A 14 Cisco ONS 15454 Procedure Guide R5 0 December 2004 Appendix A CTC Information and Shortcuts Equipment Inventory ...
Страница 850: ...Index IN 22 Cisco ONS 15454 Procedure Guide R5 0 December 2004 description 4 11 remove 18 23 ...