13-6
Cisco ONS 15454 Procedure Guide, R5.0
December 2004
Chapter 13 Convert Network Configurations
NTP-A303 Convert an Unprotected Point-to-Point or 1+1 Linear ADM to a Two-Fiber BLSR Automatically
Step 8
Complete the
“DLP-A377 Provision Section DCC Terminations” task on page 20-61
for the working
OC-N cards in the new node that will connect to the linear ADM network. Alternatively, if additional
bandwidth is needed for CTC management, complete the
“DLP-A378 Provision Line DCC Terminations”
.
Note
DCC failure alarms appear until you create DCC terminations in the point-to-point node during
.
Step 9
In node view, display the point-to-point node that will connect to the new node.
Step 10
Complete the
“NTP-A24 Verify Card Installation” procedure on page 4-2
to ensure that the
point-to-point node has OC-N cards installed that can connect to the new node.
Step 11
Create a 1+1 protection group for the OC-N cards that will connect to the new node. See the
Create a 1+1 Protection Group” task on page 17-81
for instructions.
Step 12
Create DCC terminations on the working OC-N card that will connect to the new node. See the
“DLP-A377 Provision Section DCC Terminations” task on page 20-61
Step 13
From the View menu, choose
Go to Node View
to open the new node in node view.
Step 14
Complete the
“NTP-A28 Set Up Timing” procedure on page 4-9
for the new node. If the new node is
using line timing, make the working OC-N card the timing source.
Step 15
From the View menu, choose
Go to Network View
. Verify that the newly created linear ADM
configuration is correct. One green span line should appear between each linear node.
Step 16
Click the
Alarms
tab.
a.
Verify that the alarm filter is not on. See the
“DLP-A227 Disable Alarm Filtering” task on
as necessary.
b.
Verify that no unexplained alarms appear on the network. If alarms appear, investigate and resolve
them before continuing. Refer to the
Cisco ONS 15454 Troubleshooting Guide
for procedures.
Step 17
Repeat the procedure to add an additional node to the linear ADM.
Stop. You have completed this procedure.
NTP-A303 Convert an Unprotected Point-to-Point or 1+1 Linear
ADM to a Two-Fiber BLSR Automatically
Purpose
This procedure converts an unprotected point-to-point (two nodes) or
linear ADM (three or more nodes) to a two-fiber bidirectional line
switched ring (BLSR) without disrupting traffic.
Tools/Equipment
None
Prerequisite Procedures
NTP-A44 Provision Path Protection Nodes, page 5-20
Required/As Needed
As needed
Onsite/Remote
Onsite or remote
Security Level
Provisioning or higher
Содержание ONS 15454 Series
Страница 28: ...Tables xxviii Cisco ONS 15454 Procedure Guide R5 0 December 2004 ...
Страница 44: ...Tasks xliv Cisco ONS 15454 Procedure Guide R5 0 December 2004 ...
Страница 53: ...liii Cisco ONS 15454 Procedure Guide R5 0 December 2004 About this Guide Document Conventions ...
Страница 55: ...lv Cisco ONS 15454 Procedure Guide R5 0 December 2004 About this Guide Document Conventions ...
Страница 126: ...4 14 Cisco ONS 15454 Procedure Guide R5 0 December 2004 Chapter 4 Turn Up Node NTP A256 Set Up SNMP ...
Страница 168: ...5 42 Cisco ONS 15454 Procedure Guide R5 0 December 2004 Chapter 5 Turn Up Network NTP A172 Create a Logical Network Map ...
Страница 304: ...10 8 Cisco ONS 15454 Procedure Guide R5 0 December 2004 Chapter 10 Change Node Settings NTP A87 Change SNMP Settings ...
Страница 410: ...16 4 Cisco ONS 15454 Procedure Guide R5 0 December 2004 Chapter 16 Power Down the Node NTP A114 Power Down the Node ...
Страница 510: ...17 100 Cisco ONS 15454 Procedure Guide R5 0 March 2005 Chapter 17 DLPs A1 to A99 DLP A99 Determine Available VLANs ...
Страница 746: ...20 102 Cisco ONS 15454 Procedure Guide R5 0 March 2005 Chapter 20 DLPs A300 to A399 DLP A399 Install a UBIC H EIA ...
Страница 828: ...A 14 Cisco ONS 15454 Procedure Guide R5 0 December 2004 Appendix A CTC Information and Shortcuts Equipment Inventory ...
Страница 850: ...Index IN 22 Cisco ONS 15454 Procedure Guide R5 0 December 2004 description 4 11 remove 18 23 ...