background image

J355HA M50

Translation of the original instructions

Содержание J355HA M50

Страница 1: ...J355HA M50 Translation of the original instructions...

Страница 2: ...ht FAAC S p A ab dem 2015 Alle Rechte vorbehalten Kein Teil dieses Handbuchs darf reproduziert gespeichert an Dritte weitergegeben oder sonst auf eine beliebige Art in einem beliebigen Format und mit...

Страница 3: ...g from misuse or any use other than that for which the automated system is intended 7 Do not install the equipment in an explosive atmosphere the presence of flammable gas or fumes represents a seriou...

Страница 4: ...tic hydraulic counter terrorism traffic bollards The cylinder is moved by a hydraulic unit inside the structure 1 2 TECHNICAL DESCRIPTIONS AND SPECIFICATIONS 1 Flashing LED 2 Head 3 Cylinder 4 High po...

Страница 5: ...imum lowering time sec 2 Operating temperature C 15 55 Weight of bollard and pit kg 850 bollard 235 pit Oil quantity l 1 6 standard version 6 7 EFO version Ingress protection IP66 Size See 2 Condenser...

Страница 6: ...on of the original instructions ENGLISH 2 INSTALLATION 2 1 CONFIGURATION A flexible hose with a diameter of 100 mm should be fitted for drainage Dig the hole to a depth of approximately 1 85 m Dimensi...

Страница 7: ...7 532141 Rev A Translation of the original instructions ENGLISH 2 2 CONSTRUCTION OF THE FOUNDATION CAGE Build the foundation cage not supplied by FAAC as shown in 4 using the 12mm and 20 mm iron rods...

Страница 8: ...s purpose inside the metal pit 1 10 and the electronic board 7 Pour class C30 37 concrete around the cage to secure it properly up to about 10 cm from ground level Wait a minimum of 7 days to allow th...

Страница 9: ...ons Class C30 37 Concrete with aggregate 10 30 pursuant to UNI EN 12620 The bollard must only be installed once the concrete has cured for at least 7 days The compaction index of the surrounding soil...

Страница 10: ...ngth Thecablesmustbelaidinsideasheathof 50mmandpassedthrough the cable guides provided on the pit sheet 8 1 and through the two corrugated conduits supplied with the pit Pass the wires through on the...

Страница 11: ...9 2 After you have fully inserted the bollard resting it against the coun terframe remove the two eye bolts 11 1 and fix the bollard in place using the 24 TCEI M24x50 screws supplied with the pit IMP...

Страница 12: ...ver in place 12 2 Remove the top cover 3 UnscrewandremovethefourTORXT30screwssecuringthecover of the hydraulic control unit in place 13 1 4 Remove the cover of the hydraulic control unit 5 Unscrewthel...

Страница 13: ...UP Limit switch DOWN Limit switch common EFO pressure switch EFO solenoid valve Heater optional Refer to the diagram below EFO N O connection activtes also in case of black out EFO N C connection volu...

Страница 14: ...ou reach the b6 parameter 6 Set the value b6 Y 7 PresstheFbuttonandholditdownwhilstsimultaneouslypressing the button to exit programming screen and save the changes made For more information on progra...

Страница 15: ...UT 3 GND GND 24 V 24 V OUT 3 OUT 4 GND OPEN A STOP LOOP 1 LOOP 2 LOOP 2 LOOP 1 CLOSE FSW EMERGENCY OUT 1 OUT 2 OUT 3 GND GND 24 V 24 V OUT 3 3 7 11 13 1 dF 06 LO C 3 03 Y 4 LO Cu F F F F F F F F F F 1...

Страница 16: ...FAAC S p A Soc Unipersonale Via Calari 10 40069 Zola Predosa BOLOGNA ITALY Tel 39 051 61724 Fax 39 051 758518 www faac it www faacgroup com J355HA M50 16 532141 Rev A...

Отзывы: