background image

 

 

Operating instruction 

Oil Management OM3-020P TraxOil 

for R290 in non-explosive environment / zone 

 

 

 

 

Emerson Climate Technologies GmbH  

www.emersonclimate.eu

 

Am Borsigturm 31 I 13507 Berlin I Germany 

Date: 01.02.2019 

OM3P_OI_ML_R03_865915.docx 

G e n e r a l   i n f o r m a t i o n :  

OM3-020P use a Hall-Sensor to measure the oil level. A magnetic float changes its 
position according to the oil level. The hall  sensor converts these magnetic field 
changes into an equivalent signal, which is used by the internal electronic to show 
the actual oil level with LED’s and activate the integrated solenoid valve to feed 
missing oil directly into the compressor sump. For application in refrigeration 
systems according to EN 378. 

 Warning: 

 

OM3-020P is a potential ignition source and has not been qualified 
according to ATEX standards.

 

Installation only in “non-explosive location”. 

 

OM3-020P has special O-rings released for propane, installation in 
combination with OM0-CCP brazing adapter only.

 

  S a f e t y   i n s t r u c t i o n s :  

 

Read operating instructions thoroughly. Failure to comply can result in device 
failure, system damage or personal injury. 

 

According to EN 13313 it is intended for use by persons having the 
appropriate knowledge and skill. 

 

In a severely contaminated system, avoid breathing acid vapors and avoid 
contact with skin from contaminated refrigerant / lubricants. Failure to do so 
could result in injury. 

 

Before opening any system make sure pressure in system is brought to and 
remains at atmospheric pressure. 

 

Do not exceed the specified maximum ratings for pressure, temperature, 
voltage and current. 

 

Ensure that the system piping is grounded. 

 

Ensure that design, installation and operation are according to European and 
national standards/regulations. 

 

Before installation or service disconnect all voltages from system and device. 

Note: Float contains lead and has to be recycled after operation! 

S y s t e m   c o m p o n e n t s   ( F i g . 3 , 5 , 6 )  

Screws (3x) 

Washer (3x) 

Sight glass 

Sight glass O-ring  33x2,4 

Adapter O-ring  25,1x2,6  

Adapter (brazing) 

Flange ring 

Coil connector OM3-Pxx with screw 
M3x21 

Relay connector OM3-Nxx with 
screw M3x35 

10  Solenoid coil ESC-…,  incl.  2x O-

ring, screw holder & Cap 

11  Coil screw cap ESC-… 
12  Base unit  
13  7/16”-UNF oil connector incl. O-ring 
14  Oil connector O-ring  7,6x1,8 
15  Screw transport  holder  (to be 

removed) 

16  Compressor oil fitting 

I n s t a l l a t i o n   w i t h   B r a z i n g   A d a p t e r   O M 0 - C C P :    
(see Fig. 1,2,3,5,6) 

1.

 

Perform and consider the brazing joint as per EN 14324. 

2.

 

Insert the flange ring (7) with O-ring groove in the direction to OM3-020P on 
the compressor oil fitting (16) and hold near compressor body.  

3.

 

Insert brass adapter (6) into compressor oil fitting. 

4.

 

Use flux and silver rod having a minimum of 30% silver for optimum permanent 
joint between brass adapter and compressor oil fitting (copper coated steel). 

5.

 

When brazing, direct flame away from compressor body. Use wet rags around 
oil fitting to protect compressor paint. 

6.

 

Remove and discard the screw transport

 

holder (15) from the back side of OM3 

base unit which secure three screws (1), O-rings (2) and sight glass (3) during 
transportation.

 

7.

 

Pull the flange ring (7) away from compressor until placed firmly at the front 
end of adapter (6). Mount O-ring (5) into the groove of flange ring (7).

 

8.

 

Attach the base unit to flange ring (7) by locating the grove stamped into flange 
ring in line with the main body marking (Fig. 5) and tighten three screws (1) 
with 12 Nm torque 
Remark: For proper function the base unit must be installed horizontally (see 
Fig. 3). 

9.

 

Install the oil supply line to 7/16-20 UNF thread (13). Oil connector with screen 
and O-ring can be removed for cleaning purpose or replacement (see Fig. 6)  

P r e s s u r e   T e s t :  

After completion of installation, a pressure test must be carried out as follows: 

-

 

according to EN 378 for systems which must comply with European pressure 
equipment directive 2014/68/EU. 

-

 

to maximum working pressure of system for other applications. 

 Warning: 

 

Failure to do so could result in loss of refrigerant and personal injury. 

 

The pressure test must be conducted by skilled persons with due respect 
regarding the danger related to pressure. 

T i g h t n e s s   T e s t :  

Conduct a tightness test according to EN 378-2 with appropriate equipment and 
method to identify leakages of external joints. The allowable leakage rate must be 
according system manufacturer’s specification. 

This must be specially considered in 

conjunction with flammable refrigerant R290! 

E l e c t r i c a l   C o n n e c t i o n :   ( s e e   F i g .   3 , 4 )    

1.

 

For coil mounting please refer to coil operating instruction.  

2.

 

Connect OM3-Pxx (8) to  OM3-020P, OM3-Nxx (9) cable assembly  to coil. 
Recommended torque for the plug screws is 0.15 Nm (hand-tight). 

W i r i n g :   ( s e e   F i g .   3 , 4 )  
Note: Do not switch the compressor directly. Use compressor's  power relay 
instead. See Fig. 4 for connection of OM3-020P to the safety loop (SL) of a rack 
controller. 

 

Connect the OM3-Nxx (9) cable to the relay connection according Fig. 1,2,3:  

BU

 = 

blue  

(open in Alarm) 

BK

 = 

black 

(common) 

BN

 = 

brown 

(closed in Alarm) 

For 24V Supply 

 

The OM3-Pxx cable assembly requires a coil with 24 VAC. 

 

Connect OM3-Pxx (8) wires to the power supply (i.e. ECT-323) acc. Fig. 1 

O p e r a t i o n :   ( F i g .   4 )  

OM3-020P  is fully level controlled. The sight glass of each device is divided into 
three operational zones. When the level reaches the yellow zone (YE) the OM3-020P 
starts filling after a time delay of 10 sec. Further level drop to the red zone (RE) will 
switch the alarm relay after a time delay of 20sec.  

The current status is indicated with the 3 LEDs according to the following table: 

LED 

Status / Function 

Green 

 

Oil Level in zone 1  (60 - 40%)  

Green 

Yellow

 

Oil Level in zone 1  (60 - 40%)  &  Injection

 

 

Yellow

 

Oil Level in zone 2  (40 - 25%)  &  Injection

 

Red 

Yellow

 

Oil Level in zone 3  (25 -   0%)  &  Injection 

 

To provide the correct oil level at any time we recommend to keep the OM3-
020P  always powered on (also during compressor stand-by and shutdown 
mode

). 

 

First Installation

: After connecting OM3-020P  to power supply and oil level 

below 60%, OM3-020P starts injecting after 10sec delay, to bring oil immediately 
to a safe level. 

 

T e c h n i c a l   D a t a :  

Maximum working pressure PS: 

OM3-020P: 35 bar 

Test Pressure PT: 

OM3-020P: 39 bar 

Solenoid MOPD: 

OM3-020P: 21 bar 

Supply voltage: 

24 VAC, 50 Hz (±10%) 

Solenoid Coils: 

ESC-24VAC  

Current: 

0.7 A 

Alarm contact rating: 

1A/24 VAC 

Alarm switch: 

SPDT 

Time delay filling: 

10 sec. 

Times delay alarm: 

 

20 sec. 

Medium compatibility: 

R290 

Medium temperature: 

-20...+80 °C 

Storage, transport and ambient  temperature (housing): 

-20…+50 °C 

Oil supply fitting: 

7/16”-20 UNF male 

Marking: 

according. EMC and Low Voltage Directive 

 
 

 
 
 

 

Отзывы: