15-16
Cisco ONS 15454 Procedure Guide, R5.0
December 2004
Chapter 15 Maintain the Node
NTP-A310 Soft-Reset a CE100T-8 Card Using CTC
Step 8
Click
Yes
in the “Are you sure you want to hard-reset this card?” dialog box.
Stop. You have completed this procedure.
NTP-A310 Soft-Reset a CE100T-8 Card Using CTC
Note
Soft-resetting the CE100T-8 card is errorless in most cases. If there is a provisioning change during the
soft reset, or if the firmware is replaced during the software upgrade process, the reset is not errorless.
Step 1
Complete the
“DLP-A60 Log into CTC” task on page 17-66
at the node where you want to perform the
CE100T-8 card reset. If you are already logged in, continue with
.
Step 2
Right-click the card to reveal a pop-up menu.
Step 3
Click
Soft-reset Card
.
Step 4
Click
Yes
in the “Are you sure you want to soft-reset this card?” dialog box.
Stop. You have completed this procedure.
NTP-A215 View G-Series Ethernet Maintenance Information
Step 1
Complete the
“DLP-A60 Log into CTC” task on page 17-66
. If you are already logged in, continue with
.
Step 2
In node view, double-click a G-Series Ethernet card. The card view appears.
Purpose
This procedure soft-resets the CE100T-8 card.
Tools/Equipment
None
Prerequisite Procedures
“NTP-A246 Install Ethernet Cards and Connectors” procedure on
page 2-10
Required/As Needed
As needed
Onsite/Remote
Onsite or remote
Security Level
Superuser
Purpose
This procedure enables you to view loopback, bandwidth, and J1 path
trace information for G-Series Ethernet cards.
Tools/Equipment
None
Prerequisite Procedures
NTP-A246 Install Ethernet Cards and Connectors, page 2-10
Required/As Needed
As needed
Onsite/Remote
Onsite or remote
Security Level
Retrieve or higher
Содержание ONS 15454 Series
Страница 28: ...Tables xxviii Cisco ONS 15454 Procedure Guide R5 0 December 2004 ...
Страница 44: ...Tasks xliv Cisco ONS 15454 Procedure Guide R5 0 December 2004 ...
Страница 53: ...liii Cisco ONS 15454 Procedure Guide R5 0 December 2004 About this Guide Document Conventions ...
Страница 55: ...lv Cisco ONS 15454 Procedure Guide R5 0 December 2004 About this Guide Document Conventions ...
Страница 126: ...4 14 Cisco ONS 15454 Procedure Guide R5 0 December 2004 Chapter 4 Turn Up Node NTP A256 Set Up SNMP ...
Страница 168: ...5 42 Cisco ONS 15454 Procedure Guide R5 0 December 2004 Chapter 5 Turn Up Network NTP A172 Create a Logical Network Map ...
Страница 304: ...10 8 Cisco ONS 15454 Procedure Guide R5 0 December 2004 Chapter 10 Change Node Settings NTP A87 Change SNMP Settings ...
Страница 410: ...16 4 Cisco ONS 15454 Procedure Guide R5 0 December 2004 Chapter 16 Power Down the Node NTP A114 Power Down the Node ...
Страница 510: ...17 100 Cisco ONS 15454 Procedure Guide R5 0 March 2005 Chapter 17 DLPs A1 to A99 DLP A99 Determine Available VLANs ...
Страница 746: ...20 102 Cisco ONS 15454 Procedure Guide R5 0 March 2005 Chapter 20 DLPs A300 to A399 DLP A399 Install a UBIC H EIA ...
Страница 828: ...A 14 Cisco ONS 15454 Procedure Guide R5 0 December 2004 Appendix A CTC Information and Shortcuts Equipment Inventory ...
Страница 850: ...Index IN 22 Cisco ONS 15454 Procedure Guide R5 0 December 2004 description 4 11 remove 18 23 ...