![Amsco Century Скачать руководство пользователя страница 49](http://html1.mh-extra.com/html/amsco/century/century_operators-manual_2936190049.webp)
6-14
129373-496
Operating Instructions
Sterilizer Operation
Pressing ABORT advances display to
screen #11. Refer to "Aborting Cycles,"
later in this section.
Pressing STATUS PRINT generates a
printout of the current sterilizer chamber
status.
• Purge
– Steam flows through the chamber for the programmed time
interval.
9
GRAVITY CYCLE
PHASE:
PURGE
TIME LEFT IN PHASE:
1:00
CHAMBER:
32.0 C
00.0
psig
PROJECTED CYCLE COMPLETION TIME:
47:10
m:s
STATUS
ABORT
Pressing ABORT advances display to
screen #11. Refer to "Aborting Cycles,"
later in this section.
Pressing STATUS PRINT generates a
printout of the current sterilizer chamber
status.
NOTE: The projected cycle completion time shown on the display is
estimated. The control automatically evaluates the cycle progress and
corrects the estimated time at the beginning of each phase.
NOTE: Current time, chamber pressure and chamber temperature are
printed at each transition point.
9
GRAVITY CYCLE
PHASE:
ACTIVATE SEAL
DOOR IS WAITING TO BE SEALED
CHAMBER:
32.0 C
00.0
psig
PROJECTED CYCLE COMPLETION TIME:
47:30
m:s
STATUS
ABORT
• Activate Seal
– Door seal fills with steam and expands against the
sterilizer door opening, forming an airtight seal.