![Amsco Century Скачать руководство пользователя страница 37](http://html1.mh-extra.com/html/amsco/century/century_operators-manual_2936190037.webp)
6-2
129373-496
Operating Instructions
Sterilizer Operation
5. Close printer access door and press the
HEXAWAVE
on screen 0. Steam enters
the sterilizer jacket and heats jacket to 115°C (239°F). Printer records
sterilizer type.
0
S T E R I S S C I E N T I F I C
PREPARED FOR:
STERIS
SCIENTIFIC
CUSTOMER
STERILIZER ID:
VACO1
NOTE: If access code feature is activated, an assigned four-digit code must be
correctly entered before operator can use the sterilizer. Refer to S
ECTION
7,
E
NTERING
A
CCESS
C
ODE
.
6. Run a Leak Test cycle. Leak Test must be run at least once each week. Refer
to "Leak Test Cycle Operation," later in this section, for instructions on
running this cycle.
7. Run a DART Warm-up and a DART Test cycle. DART Test must be run at
least once a day. Refer to "DART Warm-up Cycle Operation" and "DART Test
Cycle Operation," later in this section, for instructions on running these
cycles.
8. After running the necessary test cycles, load sterilizer chamber as outlined
in "Load Sterilizer," next in this section.