![Amsco Century Скачать руководство пользователя страница 12](http://html1.mh-extra.com/html/amsco/century/century_operators-manual_2936190012.webp)
2-1
Installation Verification
Operator Manual
129373-496
INSTALLATION VERIFICATION
An Equipment Drawing showing all utility and space requirements was sup-
plied with the sterilizer. Clearance space shown on the drawing is necessary for
ease of installation and to assure proper operation and maintenance of
equipment. Uncrating and Installation Instructions were also furnished with the
sterilizer. If any of these documents are missing or misplaced, contact STERIS
giving the serial and model numbers of the equipment. Replacement copies will
be sent to you promptly.
After installing this unit according to the instructions provided, complete the
following checklist to assure that your installation is complete and correct. Or,
if you desire, contact your STERIS representative for a technician to be
scheduled to test your installation and demonstrate proper equipment opera-
tion.
❑
Clearance as specified on the Equipment Drawing must be available.
❑
Feed Water:
❑
All supply line shutoffs must be provided with lockout capability.
❑
Backflow prevention is by others.
❑
Water Pressure – measured (specification is 20 to 50 psig [1.4 to 3.5 bar],
dynamic). Water pressure supplied must be within specifications as
shown on the Equipment Drawing. If pressure is too high, a regulator must
be installed. If water pressure is too low, equipment performance will be
affected.
❑
Water Quality – supplied must be within specifications. Improper water
quality adversely affects equipment operation. Damage to the equipment
due to improper water quality is not covered under warranty.
❑
Steam Supply:
❑
Shut-offs (with provisions for lockout and tagout) located nearby.
❑
Supply piping adequately sized.
❑
Supply pressure measured (specification is 50 to 80 psig [3.5 to 5.2 bar],
dynamic).
❑
Drain Piping
must be sloped properly, and sized to handle the maximum
waste flow from the sterilizer.
2.1 Installation
Checklist
2.1.1 Service
Clearance
2.1.2 Plumbing
Services
2
CAUTION: Piping sized
too small may cause wa-
ter hammer, resulting in
damage to the sterilizer.
CAUTION: Insufficient
service clearance will
make repairs more diffi-
cult and time-consuming.
CAUTION: After instal-
lation, it is mandatory
to brace piping at the
drain funnel so that it
will not move vertically.