Installation Verification
2.1.3 Electrical
Service
2.1.4 Sterilizer Final
Check
2.1.5 Cycle Operation
❑
Electric single-phase service to the unit must be as specified on the Equipment
Drawing and on the Machine Data Plate.
❑
Electric single-phase service requires a clearly marked disconnect with lockout/
tagout capability located near the sterilizer.
❑
Electric single-phase service should be on a separate circuit, and not tied into
circuits containing large reactive loads (e.g., motors).
❑
The sterilizer's protective ground must be connected to terminal block TB-1 in
the sterilizer power box.
❑
Three-phase power for vacuum pump must meet specifications on the equip-
ment drawing.
❑
3-phase service requires a clearly marked disconnect with lockout/tagout
capability located near the sterilizer.
❑
Chamber leveled properly.
❑
Door opens and closes smoothly.
❑
Door locked switches adjusted correctly.
❑
Chamber strainer in place.
❑
Rack and shelves and/or loading car operates correctly.
❑
Paper loaded in printer.
❑
Printer ribbon properly installed.
❑
Warranty labels properly applied.
❑
Unit powers up correctly.
❑
Run Leak Test cycle — leak rate is to be less than 1.0 mm Hg/minute
(1.3 mbar/min.).
❑
Verify operation of a typical cycle (270°F [132° C] prevacuum).
WARNING - EXPLO-
SION HAZARD: This
sterilizer is not de-
signed to process flam-
mable compounds.