2 Oct 1997
14:48
CELL-DYN
®
3/35 Sample Loader TS Guide 9140234B-June 1997
TROUBLESHOOTING
IP - 11 Alarm 4 (e and j) Time-out Moving X-Axis, 3 of 8
1 - 37
1
IP - 11 Alarm 4 (e and j) Time-out Moving X-Axis, 3 of 8
≈
+12V
at each wire CN7 Pins
1, 2, 3, & 4 with
←
X
→
Pressed
?
No
- Check Connection of Motor Wires
at CPU Main Bd. CN7 Pins 1, 2, 3,
& 4
- Push each wire into place with flat-
blade screwdriver
- Disconnect In-Line Connection
Between CN7 and X-Axis Motor
- Move Needles Home
- Move X-Axis Away from Sensors
- Measure voltage at CN7 side of
In-Line Connection
Yes
B
CPU Main Board
SL-133
CN7
8..........................1
CN7 Pins 4, 3, 2, & 1
- Inspect Belt Tension and
Pulley Set Screws
- If OK, Replace X-Axis
See
Interrelationship Matrix -
X-Axis
In-Line Connector
for E & G Loaders
(F Loader - At Back of Tower)
SL-203B
Search Book TOC Go Back