28 Oct
1997 21:57
CELL-DYN
®
3/35 Sample Loader TS Guide
9140234B-June 1997
VERIFICATION PROCEDURESVP - 6.2 Mixing Head Position Adjustment
3 - 85
3
VP - 6.2 Mixing Head Position Adjustment
Purpose: Perform this procedure to align the Mixing Assembly.
1. Perform Check procedure
“VP - 6.1 Mixing Head Position Check” (Page 3-77)
2. Perform
checks.
3. Perform vertical adjustment.
a. Loosen top Ball Slide Screw (
).
b. Adjust Mixing Assembly until Paddle is parallel to straight edge (
c. Tighten Ball Slide Screws.
4. Adjust Head Position.
E and F Loader
a. Loosen Mixing Assembly screws (
).
b. Adjust Mixing Assembly until
“VP - 6.1 Mixing Head Position Check” (Page 3-77)
c. If E Loader, adjust position at both paddles.
Special Tools
DESCRIPTION
QTY
PN
Mixing Head
Adjustment Tool
1
9420082
Rack Guide
Alignment Tool
1
9420084