28 Oct
1997 21:57
CELL-DYN
®
3/35 Sample Loader TS Guide
9140234B-June 1997
VERIFICATION PROCEDURESVP - 9.1 Sample Wash Block Check/Adjustment
3 - 126
3
Figure 3-67 Sample Needle Alignment Setup
6. If check fails:
a. Perform
“VP - 3.8 Rack to Laser Shield Check” (Page 3-39)
.
Needle Alignment Tool
in Tube Position # 3
Drive
Needle
into Hole
in Tool
(
↑
N
↓
)
Place Rack Guide
Alignment Tool
with Cutout Up
and Facing Left
SL-179A
# 3