28 Oct
1997 21:57
CELL-DYN
®
3/35 Sample Loader TS Guide
9140234B-June 1997
VERIFICATION PROCEDURESVP - 5.1 Tube Detect Sensor (Beam Block) Check
3 - 68
3
5. Put tube in position #1 of Rack #1 (closest to tower),
.
6. Push (Y) to move racks toward tower.
7. MAN LED should flash with tube in #1 position and Rack #1 under tower (
).
8. Slowly lean tube side to side, front to back, and rotate tube. MAN LED should continue to flash.
Ensure LED flashes when tube leans to the right.
9. Move tube to position #1 of Rack #2. MAN LED should be OFF (
).
10.Lean tube toward Beam Block, "MAN" LED should be OFF. If either check fails, go to