28 Oct
1997 21:57
CELL-DYN
®
3/35 Sample Loader TS Guide
9140234B-June 1997
VERIFICATION PROCEDURES VP - 3.2 Platen Wall Check
3 - 20
3
VP - 3.2 Platen Wall Check
Purpose: Perform this procedure to verify Platen Walls are square to one another and Rack Guides
and Beam Block are aligned.
1. Check fit of Rack Guide Alignment Tool in Positions 1,2,3,4.
• If Check is OK, go to
“VP - 3.4 Rack Clearance Check” (Page 3-26)
• If Check Fails, go to
“VP - 3.3 Platen Wall Adjustment” (Page 3-22)
Special Tools
DESCRIPTION
QTY
PN
Rack Guide
Alignment Tool
1
9420084