28 Oct
1997 21:57
CELL-DYN
®
3/35 Sample Loader TS Guide
9140234B-June 1997
VERIFICATION PROCEDURESVP - 3.9 Rack to Laser Shield Adjustment
3 - 41
3
VP - 3.9 Rack to Laser Shield Adjustment
Purpose: Perform this procedure to align the Platen (side to side) with the Tower.
1. Perform Check procedure
“VP - 3.8 Rack to Laser Shield Check” (Page 3-39)
2. Loosen (4) Platen Mounting screws 1/2 Turn (
NOTE:Mounting screws are located below Platen wall cutouts.
3. Align Tube Positions # 3 and #5 on Laser Shield cutouts (
) by moving Platen left or
right. Tighten screws.
4. Go to
“VP - 3.10 X-Axis Solenoids to Platen Channel Check” (Page 3-43)
Special Tools
DESCRIPTION
QTY
PN
Rack Guide
Alignment Tool
1
9420084