28 Oct
1997 21:57
CELL-DYN
®
3/35 Sample Loader TS Guide
9140234B-June 1997
VERIFICATION PROCEDURESVP - 3.16 X-Axis Solenoid to Rack Guide Check
3 - 55
3
VP - 3.16 X-Axis Solenoid to Rack Guide Check
Purpose: Perform this procedure to verify alignment of X-Axis Solenoids with Rack Guides,
.
1. Remove Racks and any loose items from Platen.
2. Cycle Power Off/On.
NOTE:Do not put Loader in Manual Mode.
NOTE:Analyzer must be Initialized or Ready.
3. Wait for Sample Loader to complete initialization.
4. Verify alignment of X-Axis Solenoids at Right Rack Guide (
).
5. Verify alignment of X-Axis Solenoids at the Left Rack Guide
a. Cycle Power Off/On.
b. Observe X-Axis Solenoids. When Solenoids stop for the second time at the Left Rack Guide
turn Sample Loader Power off.
c. Use straight edge on both sides of Rack Guide (
).
Special Tools
DESCRIPTION
QTY
PN
None