VERIFICATION PROCEDURESVP - 6.1 Mixing Head Position Check
3 - 83
3
h. Mixing Head should fit completely into Tool without shifting tool or Rack. No Play between
Tool and Mixing Head. If Check Fails, go to
“VP - 6.2 Mixing Head Position Adjustment” (Page
.
G Loader [Europe]
a. Put Loader in Manual Mode.
1.
Press and Hold MAN and START.
2.
Turn Power ON, hold keys down until BEEPING stops.
b. Move X-Axis Solenoids to Left End Stop.
c. Insert Rack Guide Alignment Tool in Right End of Platen (
).
d. Load Sarstedt Tube in Position # 4 of Rack and Place Rack on Left End of Platen (
e. Press (X
→
) to move Rack into cutout. Tube should be under Mixing Paddle (
).
f.
Press (Z
↓
) to lower Mixing Head onto Tube.
g. Check Alignment of Tube.
1.
Press and hold (R) to Rotate Tube.
2.
Verify Tube is Centered in Rack while rotating (
).
3.
If Check Fails, go to
“VP - 6.2 Mixing Head Position Adjustment” (Page 3-85)
.
4.
If Check is OK, go to