28 Oct
1997 21:57
CELL-DYN
®
3/35 Sample Loader TS Guide
9140234B-June 1997
VERIFICATION PROCEDURESVP - 3.13 Platen to Laser Shield Adjustment
3 - 49
3
VP - 3.13 Platen to Laser Shield Adjustment
Purpose: Perform this procedure to align the Platen (front to back) with the Tower.
1. Perform Check procedure
“VP - 3.12 Platen to Laser Shield Check” (Page 3-47)
2. Loosen (4) Guide Rod Bracket Bolts (5mm Allen) (
).
3. If Bracket Bolts can be loosened, go to Step 5. If not, continue with Step 4.
4. If bracket bolts cannot be loosened, perform the following:
a. Loosen (4) Platen mounting screws and Adjust Platen slightly until Laser Shield is recessed
.050 - .060in. (1.25 - 1.5mm) from Platen Wall.
b.
“VP - 3.8 Rack to Laser Shield Check” (Page 3-39)
c.
“VP - 3.10 X-Axis Solenoids to Platen Channel Check” (Page 3-43)
.
d.
“VP - 3.14 Pusher Arm to Platen Check” (Page 3-51)
5. If bracket bolts can be loosened, adjust entire Platen and Guide Rod Assembly until check
) is correct.
6. Perform
“VP - 3.8 Rack to Laser Shield Check” (Page 3-39)
Special Tools
DESCRIPTION
QTY
PN
None