CELL-DYN
®
3/35 Sample Loader TS Guide
9140234B-June 1997
VERIFICATION PROCEDURESVP - 3.6 X-Axis Solenoid to Guide Rod Check
3 - 33
3
b. Install Rack Guide Alignment Tool on right side of Platen.
c. Press (
←
X
→
) to move X-Axis Solenoids to edge of tool.
d. Check distance between Tool and solenoids using a Feeler Gauge. Distances should be the
same (± .005 in., 0.127mm).
e. If Check is OK, go to
“VP - 3.8 Rack to Laser Shield Check” (Page 3-39)
.
f.
If Check Fails, go to
“VP - 3.7 X-Axis Solenoid to Guide Rod Adjustment” (Page 3-36)
.