28 Oct
1997 21:57
CELL-DYN
®
3/35 Sample Loader TS Guide
9140234B-June 1997
VERIFICATION PROCEDURESVP - 1A Power Supply Check [CE MARK]
3 - 13
3
VP - 1A Power Supply Check [CE MARK]
Purpose: Perform this procedure to verify operation of CE Mark Loader Power Supplies.
1. Ensure Line Fuse is Correct, see
.
2. Turn Power ON.
3. Verify LEDs flash and Beeper sounds.
4. Verify Barcode Reader PWR LED ON.
5. Measure voltages at CN1 and U19 on CPU Main Board (see
and
Special Tools
DESCRIPTION
QTY
PN
None
Table 3 - 3
Voltage
Fuse Type
120VAC
1.6A FB 250V (5x20mm)
220/240 VAC 2.0A SB 250V (5x20mm)