28 Oct
1997 21:57
CELL-DYN
®
3/35 Sample Loader TS Guide
9140234B-June 1997
VERIFICATION PROCEDURESVP - 6.2 Mixing Head Position Adjustment
3 - 86
3
d. Tighten hardware.
G Loader
a. While Tube is Rotating, loosen Mixing Paddle Assembly bracket screws (
) and adjust Assembly to center tube in rack. Tighten hardware.
5. Go to
“VP - 6.3 Mixing Home Sensor Check/Adjustment” (Page 3-89)
.
Figure 3-41 Back of Sample Loader
SL-242
(2) Ball Slide
Screws
Paddle
Motor
Tower Rear View
Barcode
Reader