51N
Three phase CT
summated
Single CT
YN/D or YN/Y
transformer
Single phase-
to-ground fault
ANSI05000492_3_en.vsd
0
3I
alt
ANSI05000492 V3 EN-US
Figure 273:
Step 1 fault calculation 1
This calculation gives the current fed to the protection: 3I
0fault1
.
To assure that step 1, selectivity to other ground-fault protections in the network a short
delay is selected. Normally, a delay in the range 0.3 – 0.4 s is appropriate. To assure
selectivity to line faults, tripped after a delay (typically distance protection zone 2) of
about 0.5 s the current setting must be set so high so that such faults does not cause
unwanted step 1 trip. Therefore, a fault calculation as shown in Figure
is made.
1MRK 504 163-UUS A
Section 9
Current protection
Transformer protection RET670 2.2 ANSI
547
Application manual
Содержание RELION RET670
Страница 1: ...RELION 670 SERIES Transformer protection RET670 Version 2 2 ANSI Application manual ...
Страница 2: ......
Страница 48: ...42 ...
Страница 64: ...58 ...
Страница 74: ...68 ...
Страница 104: ...98 ...
Страница 194: ...188 ...
Страница 518: ...512 ...
Страница 618: ...612 ...
Страница 648: ...642 ...
Страница 666: ...660 ...
Страница 672: ...666 ...
Страница 682: ...676 ...
Страница 844: ...838 ...
Страница 868: ...862 ...
Страница 956: ...950 ...
Страница 964: ...958 ...
Страница 1004: ...998 ...
Страница 1014: ...1008 ...
Страница 1015: ...1009 ...